|
Lot 1 - Local Administration, Lot 1 - Supply And Installation Of Workplate With Galvanized Sheet And Wooden Structure. Af_03/2022_ Psp, Lot 1 - Mechanized Cleaning Of Plant Layer, Vegetation And Small Trees (Trunk Diameter Less Than 0.20 M), Using A Tracked Tractor. Af_03/2024, Lot 1 - Light Network, Incl. Default Entrance Trifas Energy. Connection Cable To Barracoes, Distribution Board, Disj. And Wrench, Cons. 20M Between Standard Entrance And Qdg, Lot 1 - Water Box/Reservoir In Polyester Reinforced With Fiberglass, 750 Liters, With Lid., 01/22/2026 - 13:17:45, Lot 1 - Monthly Rental Of Sanitary Containers And Warehouse (Including Mobilization And Transport), Lot 1 - Mobilization And Demobilization Of Container Up To 50 Km, Lot 1 - Execution Of Supports For Container Or Habitable Module. Af_03/2024, Lot 1 - 4-Strand Barbed Wire Fence With Moors, Every 2.5 M, Wooden Turnbuckles Every 60.0M, Including Transport Of Barbed Wire And Mourao, Lot 1 - Mobilization Of Equipment, Lot 1 - Demobilization Of Equipment, Lot 1 - Support For Signage Plate In Treated Hardwood 8X8 Cm - Supply And Implementation, Lot 1 - Polyethylene Signaling Cone - H = 75 Cm And 40X40 Cm Square Base, Lot 1 - Steel Plate No. 1A Category- Dtm From 2,500 To 3,000 M- Service Road In Primary Coating, Lot 1 - Compaction Of Landfills To 100% Of Proctor Nornal, Lot 1 - Transport With Dump Truck Of 14M3- Highway In Primary Coating, With Tracked Tractor. Af_03/2024Primary Coating (Crushed Soil 60%-40%), Lot 1 - Execution Of Primary Coating With Quarry Material - 100% Intermediate Proctor., Lot 1 - Crushed Stone No. 14M3- Highway In Primary Coating Primary Coating (Gravel Soil 60%-40%), Lot 1 - Trapezoidal Gutter Without Coating - Szt 60-20 - Mechanical Excavation, Loading And Transport Of Material Of 1St Category - Dtm From 2,500 To 3,000 M - Service Path In Primary Coating 02/ 3, 067Km - Earthworks, Lot 1 - Compaction Of Landfills At 100% Proctor Nornal Techo 02/ 3, Lot 1 - Transport With 14M3 Dump Truck - Highway In Primary Coating Techo 02/ 3, Lot 1 - Execution Of Primary Coating With Deposit Material - 100% Intermediate Proctor. Primary Coating (Gritta Soil 60%-40%), No Freight Primary Coating (Gritta Soil 60%-40%), No Freight Drainage, Loading And Transport Of Material Of 1St Category - Dtm From 2,500 To 3,000 M - Service Path In Primary Coating Section 03/0, 358Km Earthworks, Lot 1 - Compaction Of Landfills At 100% Of Proctor Nornal Section 03/0, Lot 1 - Transport With 14M3 Dump Truck - Highway In Primary Coating Section 03/0, Lot 1 - Uncoated Trapezoidal Gutter - Szt 60-20 - Mechanical Excavation Drainage
|