|
Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure, Container Rental For Warehouse 1, Monthly Container Rental For Cafeteria 2, Monthly Sanitary Container Rental 1, Monthly Container Rental For Office, 22/01/2026 - 14:05:57, 22/01/2026 - 14:06:17, 22/01/2026 - 14:06:18, Shed For Sawmill And Carpentry With An Area Of 12.00 M2, Shed For Cutting And Framing With An Area Of 6.00 M2, Polyethylene Water Tank, 1000 Liters, Temporary Wooden Structure To Support A 1000 Liter Elevated Water Tank, Siding With Metallic Tile. Af_03/2024, Water Network With Water Inlet Standard Dia. 3/4, Conf. Project (1 Use), Light Network, Incl. Standard Three-Phase Power Input Conf. Project (1 Use), Sewage Network 1, Mobilization And Demobilization Of Container Leased For Construction Shed, Mechanized Cleaning Of Plant Layer, Vegetation And Small Trees Using A Tracked Tractor Af 03/2024, Mechanized Excavation Of Trench With Prof. Up To 1.5M, High Level Of Interference Af_09/2024, Mechanized Trench Backfilling With Hydraulic Excavator Width Up To 1.5 M, Depth Of 1.5 To 3.0 M, Continuous Helix Pile, Diameter Of 30 Cm, Including Concrete Fck=30Mpa And Minimum Reinforcement, Transport With Truck Body With Crane (Munck), Urban Road In Primary Coating, Mechanical Leveling Of Reinforced Concrete Piles, Diameters Of Up To 40 Cm. Af_05/2021, Technological Control Of Reinforced Concrete Works Considering Only The Control Of Concrete, Manufacture, Assembly And Dismantling Of Formwork For Crowning Block, In Sawn Wood E=25 Mm 4 Use, Slim Concrete Ballast, Applied To Crowning Blocks Or Footings. Af_01/2024, Block Frame Using 6.3 Mm Ca-50 Steel - Assembly. Af_01/2024, Block Frame Using 8 Mm Ca-50 Steel - Assembly. Af_01/2024, Block Frame Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024, Insulated Footing Frame, Baldram Beam And Running Shoe Using 6.3 Mm Ca-50 Steel - Assembly., Baldram Beam And Running Shoe Using 8 Mm Ca-50 Steel - Assembly., Baldram Beam And Running Shoe Using 10 Mm Ca-50 Steel - Assembly., Block Frame, Insulated Footing, Baldrame Beam And Running Shoe Using 12.5 Mm Ca-50 Steel, Baldrame Beam And Running Shoe Using 16 Mm Ca-50 Steel, Insulated Footing And Running Shoe Using 20 Mm Ca-50 Steel, Baldrame Beam And Running Shoe Using 5 Mm Ca-60 Steel, Concreting Running Shoe, Fck 30 Mpa, With The Use Of A Pump, Concreting Of A Crowning Block Or Baldrame Beam, Fck 30 Mpa, Surface Waterproofing With Asphalt Emulsion, 2 Coats Af_09/2023, Conventional Location Of The Work, Using A Template Of Running Boards With Points Every 2.00 M, Execution Of Reference Lines On A Template Or Trestle. Af_03/2024, Assembly And Disassembly Of Rectangular Column Formwork And Similar Structures 1, Assembly And Disassembly Of Beam Formwork, Metallic Shoring, Assembly And Disassembly Of Solid Slab Formwork, Simple Ceiling Foot 1, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 5.0 Ca-60 Steel Mm, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 6.3 Mm Ca-50 Steel, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 8.0 Mm Ca-50 Steel, Pillar Or Beam Frame
|