|
1. The Subject Of The Order Are Construction Works Entitled: Construction Of A Multi-Family Residential Building With The Necessary Technical Infrastructure At Aleja 1 Maja 32 In Giżycko, Plots No. 1345/4, 1346/1, 1348/3, 100/4, 1345/1, District 0002 City Of Giżycko.2. The Basic Scope Of Works Includes In Particular: A) Preparatory Works, B) Demolition Works, C) Construction Of Foundations, D) Construction Of Building Partitions, E) Construction Of Chimneys, F) Construction Of: - Waterproofing, - Thermal Insulation, G) Installation Of Joinery, H) Construction Of Communication In The Form Of: - A Passenger Lift Serving All Floors And Obtaining Technical Acceptance By The Office Of Technical Inspection, - Stairs, I) Execution Of Works Supplementary And Finishing Works,J) Construction Of Connections,K) Construction Of A Transformer Station,L) Construction Of Sanitary Installationsm) Construction Of Energy Installationsn) Construction Of Telecommunications Installations:O) Installation Of Installation Equipmentp) Construction Of Hardenings:Q) Construction Of External Area Lighting,R) Construction Of Extensive Surfaces With Planting Of Low Greenery,S) Transport And Disposal Of Construction Waste. A Detailed Description Of The Subject Of The Order Is Included In The Design Documentation And Stwiorb, Constituting Annex No. 9 To The Swz. 4. The Ordering Party, Pursuant To Art. 95 Of The Public Procurement Law, Requires The Contractor Or Subcontractor To Employ, Under An Employment Relationship, Persons Performing Activities Related To The Execution Of The Order, The Performance Of Which Consists In Performing Work In The Manner Specified In Art. 22 § 1 Of The Act Of June 26, 1974, Labor Code (Consolidated Text: Journal Of Laws Of 2025, Item 277, As Amended) The Above Requirement Of Employment Under An Employment Relationship Applies To Manual Workers Directly Performing Construction Works Covered By The Subject Of The Contract In The Scope Of: A) Demolition And Earthworks, B) Carpentry Works, C) Masonry Works, D) Works Insulation, E) Assembly Works, F) Land Development, G) Finishing Works, H) Operation Of Vehicles And Devices, The Above Requirement Does Not Apply To Freelancers, Including Construction Managers And Works Managers. 7. Detailed Requirements Regarding The Implementation And Enforcement Of The Employment Requirement Based On An Employment Relationship Are Specified In The Draft Provisions Of The Contract, Constituting Annex No. 6 To Swz.8. The Ordering Party Does Not Reserve The Right To Apply For The Contract Only By Contractors Referred To In Art. 94 Of The Act And Does Not Provide For The Requirements Referred To In Art. 96 Of The Act.9. Pursuant To Art. 100 Of The Act Of 11 September 2019 Public Procurement Law Act Of 11 September 2019 - Public Procurement Law (Consolidated Text: Journal Of Laws Of 2024, Item 1320, As Amended). And Art. 5 Section 2 Act Of July 19, 2019 On Ensuring Accessibility For People With Special Needs (Consolidated
|