|
Preparation Of An Electricity Input Adequacy Project With The Concessionaire, With Low Voltage Measurement And Demand Up To 75 Kva, Preparation Of An Electricity Input Adequacy Project With The Concessionaire, With Medium Voltage Measurement, Simplified Substation And Demand From 75 Kva To 300 Kva, With Medium Voltage Measurement And Demand From 75 Kva To 300 Kva, With Measurement At Medium Voltage And Demand Above 300 Kva To 2 Mva, Removal Of External Luminaire Installed On A Pole, 15/12/2025 - 08:54:20, 18/12/2025 - 09:48:50, 21/01/2026 - 08:34:37, Removal Of Luminaire External Installed On Iron Arm, Replacement Of External Luminaire Installed On Pole, Replacement Of Iron Pole, Including Fixing Base, Replacement Of Luminary Arm, Replacement Of Iron Pole Set In The Ground, Hydraulic Crane, Maximum Load Capacity 6200 Kg, Maximum Load Moment 11. 7 Tm, Reach Maximum Horizontal 9.70 M, Including Toco Pbt Truck 16,000 Kg, Power Of 189 Hp, Electricians Assistant With Additional Charges, Electrician With Additional Charges, Electrical Technician With Additional Charges, Replacement Of External Luminaire Installed In Iron Arm, Removal Of Iron Pole, Removal Of Iron Pole Embedded In The Ground, Bulb Replacement For Public Lighting (Not Included). Af_02/2025_Ps, Maximum Load Capacity 8500 Kg, Maximum Load Moment 30, 4 Tm, Maximum Horizontal Reach 14, 30 M, Including Pbt Truck 23,000 Kg, Power Of 256 Hp And Fixed Open Wooden Body - Day Chp. Af_05/2025, General Services Assistant With Additional Charges, Bricklayer With Additional Charges, Construction Engineer (H), Construction Engineer / Senior Architect (H)
|