|
Ro-41081 - Regularization Of The Subgrade With Normal Proctor. Ro-41081 - Regularization Of The Subgrade With Normal Proctor., Ro-43113 - Execution Of Granulometrically Stabilized Soil Base Ecompaction Of The Material, Exclusive Acquisition And Transport Of The Material., Ro-51228 - Execution Of Printing With Bituminous Material, Iro-51228 - Execution Of Printing With Bituminous Material, Including Supply And Transport Of The Bituminous Material Within The Construction Site, Exclusive The Transport Of The Bituminous Material To The Plant., Ro-51229 - Execution Of Connection Painting With Bituminous Material-51229 - Execution Of Connection Painting With Bituminous Material, Excluding Transport Of The Bituminous Material To The Plant., Ro-14019 - Hot Machined Bituminous Concrete - Cbuq (Execution-14019 - Hot Machined Bituminous Concrete - Cbuq (Execution, Including Machining, Application, Spreading And Compaction, Supply Of Aggregates And Bituminous Material, Excludes Transport Of Aggregates And Bituminous Material To The Plant And The Ready Mass To The Track). Transport Of Material From Deposit To Conservacao-41339 - Transport Of Material From Deposit To Conservation Dmt Of 15 To 20 Km (Gravel)., Ro-41376 - Transport Of Material (Cap 50/70 For Cbuq). 10 Km, Ro-41368: Transport Of Hot-Machined Bituminous Concrete. (Printing). Transport Of Material Of Any Nature., Ro-41376 - Transport Of Material (Connection Painting). ≫=50, 10 Km (Transportation Of Bituminous Material Dmt Over 50 Km (Connection Painting)., Ro-40157: Excavation, Spreading, Mention And Trasnpro-40157: Excavation, Mention And Transport Of First Category Material With Truck. Dmt From 2,501 To 3,000 M, Ed-14762: Urban Concrete Gutter (Scu), Type 1, With Fck 1Ed-14762: Urban Concrete Gutter (Scu), With Fck 15 Mpa, Width 50Cm With Slope Of 3%, 7Cm Wide, Deer-Mg Standard, Excluding Curb, Including Excavation, Piling And Transport With Removal Of Excavated Material (In Cacamba), Ed-51141 - Cast In Place Concrete Curb 15 Lateral, Exclusive Loading, Transport And Unloading.Ed-51111-Mechanical Excavation Of Trenches With Depth Less Than Or Equal To 1, Transport And Unloading., Ed-49811 - Forming And Deformation Of Resin Plywood, Esp. (Fundacao)
|