Tender for For Running Contract For Hon,Ble Sansad Nidhi/Vidhayak Nidhi And Other Deposit Works Under Edd-Bilsi, Budaun (Semi Turnkey).-- 1 The work of safe carriage of the following material from Navada Badaun store center to work siteunder the jurisdiction of LT/11 KV under EDD BILSI BADAUN . Approx. distance upto 50 Km. Including safe loading and unloading. 2 PCC Pole 8.5 meter long. 3 PCC Pole 11 Mtr Long 4 STP 11 Mtr Long 5 STP 13 Mtr Long 6 Line material i.e., cross arm/ pin insulator/stay/earthing rod/Ms Channel/MS Angle/Disc Fitting/Disc Insulators etc 7 11 KV XLPE Cable Size 3x70sqmm 8 11 KV XLPE Cable Size 3x120sqmm 9 11 KV XLPE Cable Size 3x185sqmm 10 11 KV XLPE Cable Size 3x300sqmm 11 ACSR Weasel Conductor 12 ACSR Rabbit Conductor 13 ACSR Raccon Conductor 14 ACSR Dog Conductor 15 3 Phase Arial Bunched Conductor 16 1 Phase Arial Bunched Conductor 17 Distribution Box 1 Phase 18 Distribution Box 3 Phase 19 11 KVCable Box Size 3x70sqmm 20 11 KV Cable Box Size 3x120sqmm 21 11 KV Cable Box Size 3x185sqmm 22 11 KV Cable Box Size 3x300sqmm 23 Straight Through 24 11/0.4 KV 3 Phase 25 KVA T/F 25 11/0.4 KV 3 Phase 63 KVA T/F 26 11/0.4 KV 3 Phase 100 KVA T/F 27 11/0.4 KV 3 Phase 250 KVA T/F 28 11/0.4 KV 3 Phase 400 KVA T/F 29 11 KV Pilfer proof Metering cubical and CT PT Unit 30 11 KV VCB incoming/outgoing 31 Erection of new PCC Single/Double pole in H.T/L.T lines including fitting of all accessories as per RESSPO Norms 32 PCC Pole 8.5 Mtr Long Single Pole 33 PCC Pole 8.5 Mtr Long Double Pole 34 ST Pole 13 Mtr Long Single Pole. 35 ST Pole 13 Mtr Long Double Pole. 36 ST Pole 11 Mtr Long Single Pole. 37 ST Pole 11 Mtr Long Double Pole. 38 PCC Pole 11 Mtr Long Single Pole. 39 PCC Pole 11 Mtr Long Double Pole. 40 Grouting with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/Concreate & sand Required as per RESSPO Norms 41 PCC Pole 8.5 Mtr Long Single Pole 42 PCC Pole 8.5 Mtr Long Double Pole 43 ST Pole 13 Mtr Long Single Pole. 44 ST Pole 13 Mtr Long Double Pole. 45 ST Pole 11 Mtr Long Single Pole. 46 ST Pole 11 Mtr Long Double Pole. 47 PCC Pole 11 Mtr Long Single Pole. 48 PCC Pole 11 Mtr Long Double Pole. 49 Dismantling of PCC/ST Pole due to line shifting/damaged complete in all respect 50 ST Pole 9 Mtr Long Single Pole. 51 ST Pole 9 Mtr Long Double Pole. 52 ST Pole 11 Mtr Long Single Pole. 53 ST Pole 11 Mtr Long Double Pole. 54 ST Pole 11 Mtr Long Tri Pole. 55 ST Pole 11 Mtr Long Four Pole. 56 The work of Driving the earthing electrode and making connections with 6 S.W.G. GI wire as per RESSPO Norms 57 LT ABC (3x95+1x70+1x16) SQ. MM 58 LT ABC (3x120+1x95+1x16) SQ. MM 59 Dismantling of Old and damaged conductor complete in all respect 60 Dismantling of Existing Distribution Transformer for increasing capacity/Shifting complete in all respect 61 11/0.4 KV 3 Phase 25 KVA T/F 62 11/0.4 KV 3 Phase 63 KVA T/F 63 11/0.4 KV 3 Phase 100 KVA T/F 64 11/0.4 KV 3 Phase 250 KVA T/F 65 11/0.4 KV 3 Phase 400 KVA T/F 66 Laying, Stringing & Sagging of Following Conductor complete in all respect 67 ACSR Weasel Conductor 68 ACSR Rabbit Conductor 69 ACSR Raccon Conductor 70 ACSR Dog Conductor 71 3 Phase Arial Bunched Conductor 72 1 Phase Arial Bunched Conductor 73 Erection andfixing of Overhead Line By XLPE Cable Complete in all respect. 74 11 KV XLPE Cable Size 3x70 sqmm 75 11 KV XLPE Cable Size 3x120 sqmm 76 11 KV XLPE Cable Size 3x185 sqmm 77 Mounting of CT PT unit on double pole complete in all respect. 78 Installation of 11 KV Pilfer Proof Metering Cubicle in metering room complete in all respect 79 11 KV VCB incoming/outgoing installation 80 Under ground laying of Following cable in Single circuit on river sand to Double pole situated at both sides of road complete in all respect. Minimum depth should be 0.75 Mtr and cable should be covered by bricks from three sides. 81 11 KV XLPE Cable Size 3x70 sqmm 82 11 KV XLPE Cable Size 3x120 sqmm 83 11 KV XLPE Cable Size 3x185 sqmm 84 11 KV XLPE Cable Size 3x300 sqmm 85 Under ground laying of Following cable in Single circuit by drill method to Double pole situated at both sides of NH/SH/Railway Crossing (with HDPE Pipe if required) complete in all respect. 86 11 KV XLPE Cable Size 3x70 sqmm 87 11 KV XLPE Cable Size 3x120 sqmm 88 11 KV XLPE Cable Size 3x185 sqmm 89 11 KV XLPE Cable Size 3x300 sqmm 90 Hoisting of Following size 11 KV & 33 KV XLPE Cableon double pole with GI pipe of size 6 " dia 4 Mtr long including the jumpering complete with clamps , nut and bolts 91 11 KV XLPE Cable Size 3x70 sqmm 92 11 KV XLPE Cable Size 3x120 sqmm 93 11 KV XLPE Cable Size 3x185 sqmm 94 11 KV XLPE Cable Size 3x300 sqmm 95 Supply & Laying of G.I. Pipe at various places i.e road crossing & Hoisting etc. complete in all respect (GI pipe would be Provided by contractor at his own cost) 96 Supply & Laying of HDPE Pipe at various places i.e road crossing & Hoisting etc. complete in all respect (HDPE pipe would be Provided by contractor at his own cost). 97 Chemical earthing of T/F& Fencingincluding all materials (chemical, gi pipe, gi strip, nut bolt, etc) 98 Earthing of distribution T/Ffor body & neutral upto water level with GI Pipe of 1.5" Dia. Including GI strip size 35x6 mm. (all material will be supplied by Contractor). 99 Construction of 250/400 KVA T/F plinth 2x2x1.5 Mtr. for mounting T/F including foundation work (below ground 0.5 M), Brick work, RCC slab of 4” thickness and plastering in 1:6 ratio with 02 Nos channel pieces of 1.5 mtr long of size 100x50x6 mm compete in all respect as per UPPCL Norms. 100 Cage fencing of 250/400 KVA Plinth mounted transformer in Town areas to avoid electrical human/cattle accidents by fabrication of cage (1 Inch Sq wire mesh) madeof 10 No gauge in suitable size angle iron frame of size 7.5'(L)x5'(W)x8'(H) by strengthening of wire mesh 20x3 mm M.S. flat horizontally as well as vertically, Grouting the panel with 1:2:4 cement/coorse send/brick ballast. The Frame should be bolted on angles at the four corners so that frame may be un-bolted/bolted at the time of replacement of the transformer. Provision of 1 gate should be there formaintenance of the transformer. Painting (1 coat of red oxide + 2 coat of Bus green enamel paint). The wire mesh should be earthed with 50x6 mm MS earthing strip with existing earthing of Transformer Body. All manpower, material and T&P provided by the contractor to complete the fabrication, transportation and installation. 101 The work of digging of pits, erection of Stay Clamp, Insulator etc. 102 Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms. 103 Installation of 11 KV Pilfer Proof Metering Cubicle in metering room complete in all respect 104 Mounting of Following Capacity Transformers as per norms complete in all respect 105 25 KVA T/F 106 63 KVA T/F 107 100 KVA T/F 108 250 KVA T/F 109 400 KVA T/F 110 Fixing of Distribution Box complete in all respect 111 Guarding at road crossing complete in all respect 112 Errection & Fixing of Cable box 113 11 KVCable Box Size 3x70sqmm 114 11 KV Cable Box Size 3x120sqmm 115 11 KV Cable Box Size 3x185sqmm 116 11 KV Cable Box Size 3x300sqmm 117 Straight Through 11 KVCable Box Size 3x70sqmm,3X120sqmm,3x185sqmm) 118 Cutting of Tree Branch CommingNear Line 119 Supply & Fixing of Following Items to complete the work (IfNot available in stores) 120 LT Clamps 121 Nut & Bolt off size 122 F Clampas per RESSPO Norms 123 Shackle Insulatoras per RESSPO Norms 124 X-Arm Holding Clampas per RESSPO Norms 125 clamps for top, t-off & other channel etc. 126 Stay Clampsas per RESSPO Norms 127 Three Phase Distribution Box Clamp (LS) 128 Dead End Clamp 129 Eye Hook 130 J Hook 131 LT Shackle Insulator 132 Barbed Wire 133 Red Oxide Paint 134 Aluminum Paint 135 Number Plate 136 Al. Lugs 70 Sqmm mm 137 Al. Lugs 150 Sqmm mm 138 Al. Lugs 240 Sqmm mm 139 Al. Lugs 400 Sqmm mm 140 11 KV DO Fuse Set 141 Garding Angle 142 Garding Angle Clamp with Nut & Bolt 143 Suspension Clamp for XLPE Overhead 144 Danger Board 145 Stone Pad 146 M.S. Top Channel 147 M.S. T-off Channel 148 MS angle T/F Base 149 Dropper Channel 150 Safe back carriage of Distribution Transformer from work siteto Navada Store approx. distance upto 50 Km including safe loading & unloading. 151 A.B. Cable Scrap 152 Iron Scrap 153 STP Pole Scrap 154 ACSR Weasel Conductor Scrap 155 11/0.4 KV 3 Phase 25 KVA T/F 156 11/0.4 KV 3 Phase 63 KVA T/F 157 11/0.4 KV 3 Phase 100 KVA T/F 158 11/0.4 KV 3 Phase 250 KVA T/F 159 11/0.4 KV 3 Phase 400 KVA T/F 160 Note:-All Item Rate filling with GST by the firm
Contact Information
Contact Person
SE, EDC, BDN
Address
BUDAUN
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 107772848
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.