Tender for Deposit Work(Running Work) In Sub Division First Under Edd Barabanki.-- 1 Safe loading Carriage including unloading and proper stacking of following materials from central store Barabanki / JE Store to site of work. 2 PCC Pole /STP Pole 8.5/11/13 Mtr long 3 PCC pole 11 mt long 4 33/11kv Pin Insulator . 5 33/11kv Disc Insulator . 6 33/11kv X-ARM 7 MS Earthing Rod 8 Transformer 25/63/100 KVA 9 Transformer 250KVA 10 ABC Cable 3x50SQ. MM. 11 ABC Cable 3x95 SQ. MM. 12 ABC Cable 3x120 SQ. MM. 13 ABC Cable 1x25+1x16 SQ. MM. 14 33/11 KV XLPE Cable 3x70++3x120+3x185,3x300 sqmm 15 33 kv outdoor Cable Joint Kit 16 ACSR Weasal Conductor/dog /rabit 17 LT D.B. Box 18 11KV CT/PT Unit 19 11 KV Metering Cubical/pilfer 20 Stay Set Complete 21 Stay Wire GI 7/8 SWG 22 Stay Clamp 5 1/2 23 33 KV Top Channel 125X65X3200 mm 24 33 KV Dropper Channel 100X50X2600 mm 25 Other Line Material 26 Dragging of pole from JE Dump Store to site 27 Erection of Stay set of 16x1800 mm rod duly painted with red oxide,anchor plate, andstay insulate etc. 28 Stringing and sagging of 11 KV line with ACSR Weasal/dog/rabit Conductor including nuzzling binding and jumpering (weasal conductor will be provided by the department) 29 Pipe Earthing ( Boring type 40 Feet) /camical earthing 30 Installation of Mounting of Following capacityof Transformer including its connection between 11 KV and LT Line mountingprovinding Crimping type Aluminium lugs of required size.( All the material except transformer will be arranged by the contractor) 31 Mounting of 25/63/100 KVA Tranformer 32 Mounting of 250 KVA Tranformer 33 Installation of fixing 11 KV CT/PT with required meterial. 34 Installation of fixing 11 KV Pilfer Unit with required meterial. 35 Errectionof Substation type double pole with PCC /STP 8.5/11/13 PoleMtr. Long . including mounting of Top Channal Dropper Channel, base angle with clamps with nut & bolt, fitting of 33/11 KV pin & Pin insulator. 36 Errectionof Substation type four pole with PCC /STP 8.5/11/13 PoleMtr. Long . including mounting of Top Channal Dropper Channel, base angle with clamps with nut & bolt, fitting of 33/11 KV pin & Pin insulator. 37 Errectionof singlePCC 8.5/ST Pole9/11/13for Stringing, jumpharing and sagging of conductor 1/6 of total length of poles 38 Errectionof singlePCC pole 11for Stringing, jumpharing and sagging of conductor 1/6 of total length of poles 39 Stringing and Sagging of LT 1x16 ABC Cable (LT ABC Cable will be provided by the department) 40 Stringing and Sagging of LT 3x50 ABC Cable (LT ABC Cable will be provided by the department) 41 Stringing and Sagging of LT 3x95ABC Cable (LT ABC Cable will be provided by the department) 42 Stringing and Sagging of LT 3x120ABC Cable (LT ABC Cable will be provided by the department) 43 Installation of D.B. Box 44 Earthing of pole with MS Earthing. 45 Provinding & Fixing of various type materials. All materials shall be supplied by the contractor. 46 Nut & Bolt 47 PG CLAMP 48 Clamp for Top/ Dropper and T-off2/Stay/LT clamp /F-clampGI PIPE CLAMPetc. 49 GI Pipe 3"&4'' DIA 50 GI Pipe 6" DIA 51 MS Angle Iron 65x65x6 mm Bracing With 4 Clamp 52 Stone Pad 300x300x75 mm 53 Pipe Holding Clamp 54 Cable Hoisting Clamp 55 HDPE Pipe 8 Inch DIA 56 D.O fuse set 57 basing angle 58 L T Insulator 59 Looping and Choopping of tree branches in laying on the route of line. 60 Laying of 33/11 KV XLPE Cable 3x70++3x120+3x185,3x300 sqmmBy MM Manually, Brick and Sand, Drill Method 61 felling and heat treatment of cable box 62 Concreating and pilinthing of ST& PCCPole 18x24 CM. 63 Wairmesh fencing of 11/.04 kv substation shall be maderecatangular offsize as per site requirment fabrication 45x45x5mm angle .. (All the material will be arranged by the contractor) 64 Construction of massionry typetransformer plinth of sutable size. (All the material will be arranged by the contractor at his own cost). 65 Construction of LT Distribution Cum LT Protection Box in Rectangle Shape made of MS Angle For Installation of Henley Type Tailness Fuse Unit 300/500 AMP 650 Volt 3 nos Outgoing Circuits With 4 Nos Copper Bus Bar Proper Grouting of Structure by digging of pits with the help of cement, coresand and aggregate in the ratio 1:3:6 and fabrication of structure complete. 66 Fabricate with hole suitable size in steel items, receive from central store lightas top channel/dropper channel sub station base angle etc. 67 Looping of cable and mounting of pole. 68 Gaurding of 11 KV Line 69 T P M O set 70 Dismentaling of 11 KV Line & poll 71 Other line work
Contact Information
Contact Person
SE EDC BARABANKI
Address
33/11 KV SUBSTATION BAREL BARABANKI
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 107772831
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.