|
Construction Work For Swimming Pool – Design And Construction Of A Swimming Pool In Siófok. Design And Construction Of A New Gymnasium 8600 Siófok (Hrsz.: 10083/3) Based On Type Plan Ttt3 On A Useful Floor Area Of 2,461 Square Meters, By Adapting The Blueprints Of The Gymnasium And Plans With An Interim Work Permit. The Training Pool Contains Two Swimming Pools. The Dimensions Of The Smaller Training Pool Are 16 X 8.5 X 0.8 M, With A Water Surface Of 136 M2, The Dimensions Of The Larger Pool Are 25 X 16 X 1.9 M, With A Water Surface Of 400 M2, I.E. A Total Of 536 M2 Of Water Surface. In The Case Of The Ttt3 Type Plan, The Training Center Should Be Able To Accommodate 120 Guests. The Main Building Is Made With A Floor Plan Size Of ~ 49 X 18 M, Which Is Partially Basement, Ground Floor And Sometimes Has A Floor Plan. The Reception Area Should Be Suitable For The Simultaneous Stay Of 80 People. In The Main Building, In Addition To The 2-By-2 Group Female-Male Changing Room, A Co-Educational Changing Room With Cabins Will Also Be Created, In Addition, There Will Be A Finnish Sauna On The Ground Floor And A Conditioning Room On The First Floor. On The Ground Floor, It Is Necessary To Create The Cashiers Room, Office Space, Cleaning Room, And Staff Rooms In The Forecourt. On The Ground Floor And In The Basement, The Swimming Pool Technology Rooms: Chemical Storage, Water Engineering Rooms (Buffer Tanks, Electrical Rooms, Etc.), Heating Center. A Valid Building Permit Is Not Available, The Preparation Of Licensed Plans, The Acquisition Of A Building Permit And The Preparation Of Construction Plans Are Also Part Of This Procedure. It Is Necessary To Prepare The Authorization And Construction Plan Documentation Using Bim Methodology, Based On What Is Recorded In The Bim Implementation Plan. The Winning Tenderer Is Obliged To Provide Design Supervision To The Extent Necessary Until The Completion Of Construction. The Tenderers Task Is To Carry Out The Full-Scale, Turnkey Construction Of The Training School Covering All Disciplines (Architecture, Supporting Structures, Building Mechanics, Building Electricity, Utilities, Road And Garden Construction, Etc.) Utilities, Landscaping, The Main Content And Quantities Shown In The Plans (Including Built-In Furniture And Built-In Devices, But Without Mobile Furniture And Mobile Educational Devices). Regarding The Total Net Floor Area Of The Premises: Building Mechanical Systems: Water-Firewater And Sewage, Rainwater Drainage, Central Heating-Cooling. Regarding Licensed Plans, Customer Acceptance Is Required Before Submission To The Licensing Procedure (Plan Inspection). Regarding Construction Plans, Customer Acceptance Is Required Before Construction Can Begin (Plan Control). The Building Is Barrier-Free. Main Building Engineering Works: - Ensuring The Heat Requirements Of The Mechanical Systems With A Wall-Mounted Condensing Boiler - Construction Of A Heat Pump System - Construction Of An Air-Technical Network To Ensure Ventilation - Complete Planning Of The Swimming Pool Machinery - The Gas Power Requirement Of The Sauna Building
|