Technical Planning Services – Electrical And Control Technical Plans Karb.. The Customer Plans To Conclude A Framework Contract With The Quantities Planned Below In The Amount Of Huf 494,500,000+Vat And Undertakes To Draw 70% Of The Framework Amount. The Planned Quantities Indicated In Annex No. 3 Of The Contract (Price Table) Can Be Transferred Between Individual Task Types And Between Years, Up To The Limit Amount. 1. The Contractors Task Is The Mvm Paksi Atomerőmű Zrt. (Client) Electrical And Control Technology Specialist Area 1-4. Regular Maintenance Of Block Plans, Listing Of Changes, And Filling In Missing Plans (By Preparing An Implementation Plan) On A Computer. Maintaining The Customers Documentation At An Appropriate Level, Thereby Facilitating The Customers Operation And Maintenance Activities. Checking Current Path Plans That Were Previously Completed With The Planning System And Not Updated In The Meantime, Compared To The Currently Valid, Paper-Based Plans. Maintenance Of The Axsys.Engine Database - Using Axsys Software - Based On The Modifications. 2. The Contractors Further Task Is To Comply With The 1/2022 On The Nuclear Safety Requirements Of Nuclear Facilities And The Related Official Activity Of The Customers Electrical And Control Technical Field. (Iv.29.) Classified In 2,3,4 Safety Classes 1-4 According To Abos** Prescribed In § 34 Of The Oah* Decree. Regular Maintenance Of Block Plans (Making Illegible Plans Fully Legible, Replacing Missing Plans On A Computer (Preparation Of Implementation Plans), Elimination Of Design Errors - In Compliance With The Guidelines Stated In The Annex To This Technical Description - Checking And Modifying Cad-Based Plans, Carrying Out Plan Modifications) In Order To Maintain The Plan Documentation At An Appropriate Level, Thereby Facilitating The Operation And Maintenance Activities Of The Customer: * National Atomic Energy Agency ** Safety Classification Of Nuclear Power Plant Systems (Abos) 3. Making Illegible Plans Fully Legible: The Way To Make Fully Legible Electrical And Control Technical Plans That Are Hard To Read Or Not At All Is To Redraw The Plan With Axsys.Engine Software In The Case Of A Circuit Plan, Or With Autocad Software In The Case Of An Assembly Plan. 4. Replacement Of Missing Plans (Preparation Of Implementation Plans): Replacement Of Electrical And Control Engineering Plans That Are Missing From The Customers Documentation And Cannot Be Found In The Customers Maintenance And Operation Organizations (Preparation Of Implementation Plans) For Technological Equipment That Has Already Been Implemented Based On An On-Site Survey. 5. Elimination Of A Design Error: Elimination Of The Design Problem Submitted By The Design Error Reporter On All Related Design Types (Including, But Not Limited To, The Current Path Plan, Terminal Block Plan, Wiring Plan, Front View Plan, Cable Log, Schematic Diagram). 6. Check And Modification Of Cad-Based Plans: Checking Current Path Plans Completed With The Axsys.Engine And/Or Autocad Design System And Not Updated In The Meantime, Compared To Valid Paper-Based Plans (Temporary Master Copy). The Axsys.Engine
Contact Information
Contact No.
+36 75507341
Email
kozbeszerzes@npp.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 107742396
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.