|
1. The Subject Of The Order Is The Renovation Of Walls, Ceilings And Floors In Classrooms And In The Corridor On The Ground Floor And On The First Floor In The 1St Secondary School In Jaworzno At Ul. Licealna 3. The Scope Of Renovation Includes: - Walls, Ceilings And Floors - Classrooms No. 27-33, Corridors On The Ground Floor And First Floor, Common Room, Vestibule, - Walls And Ceilings - Staircases, Classroom No. 26, Principals Room And Room. Utility Rooms On The Ground Floor, - Floors In The Vestibule And Teachers Room And In The Back Room, In The Communication Area In The Sports Facilities. Painting Walls And Ceilings: Carving Out The Walls And Installing Ventilation Grilles, Securing Floors And Windows, Scraping And Washing Off Old Paint, Preparing The Surface For Painting Along With Filling Unevenness, Wiping The Plaster Of Internal Walls And Ceilings, Priming The Substrates - Vertical And Horizontal Surfaces, Painting With Paints Twice Emulsion Plastered Wall Surfaces And Ceiling Surfaces, Double Painting With Oil Paints Of Wall Surfaces, Grates And Balustrades At The Stairs, Transom Windows, Window Sills, Cutting And Facing The Plinth With Tiles At The Stairs Near The Side Staircase On The 1St Floor, Removal And Disposal Of Rubble. Pvc Floor Coverings: Demolition Of Wooden Plank Floors, Plastic Floor Coverings, Tearing Off The Terrazzo Mass In Vestibule And A Strip Of Concrete Floor On The Ground Floor, Milling The Surface Of The Concrete Floor After Removing The Parquet, Leveling Local Defects, Making A Cement Floor With Reinforcement In The Vestibule And After Chipping Away The Concrete Strip, Repairing Cracks In The Floor, Cleaning The Subfloor, Concrete Screed, Priming The Subfloor, Making Horizontal Insulation With Liquid Foil, Making A Leveling Layer With Cement Mortar, Priming The Subfloor For Plastic Floor Coverings, Filling Unevenness And Making Strips Of Plaster After Breaking The Wall Strips, Making 15 Cm Wide Strips Of Plain Plaster After Dismantling Wooden Plinths, Laying Carpets With A Fold On The Wall, Welding Floor Coverings. Parquet Floors: Local Replacement Of Parquet, Demolition Of Wooden Plinths, Mechanical Sanding Of Parquet Floors, Filling Of Gaps In Parquet Flooring, Replacement Of Wall Strips And Two-Time Oil Painting, Varnishing Of The Parquet Floor, Removal And Disposal Of Waste. Door Joinery: Carving Out Wooden Door Frames From The Wall, Removing Unevenness On The Wall Surface In Order To Level And Adapt To The Required Width Of The Door Opening With Polyurethane Foam Sealing, Supplementing Internal Plasters At The Openings Of The Replaced Doors, Filling And Smoothing Unevenness, Repainting Emulsion Paint And Paneling With Oil Paint, Installation Of Steel Door Frames And Internal Door Leaves And Their Adjustment, Adjustment Of Door Leaves, Installation Of Door Sill Strips, Removal And Disposal Of Rubble. Other Construction Works: Construction Of A Floor Of Stoneware Tiles In The Vestibule Using Adhesive Mortar,
|