|
The Subject Of The Investment Is The Thermal Modernization Of The Complex Of Buildings Of The Commune Office In Osiu, Together With The Reconstruction Of Some Rooms, The Construction Of An Underground Gas Tank, External And Internal Gas Installations As Well As The Demolition, Reconstruction And Expansion Of External Stairs, Located On Plots With Registration Numbers 181 And 186 In Osiu, Osie Commune, Świecie Poviat, Kuyavian-Pomeranian Voivodeship. The Commune Office Is Located In A Complex Of Two Adjacent Buildings. Buildings At 6 Dworcowa Street In Osie. Both Buildings Are Functionally Connected And Intended For Administrative Rooms. Building No. 1 Was Made Of Brick Technology. It Is A Two-Story Building With An Attic And A Wooden Gable Roof. The Facility Has A Partial Basement. Building No. 2 Is A Two-Story Building With A Full Basement. The Building Has A Flat Roof In The Form Of A Ventilated Roof. The Technical Equipment Of The Building Complex Includes Electrical, Lightning Protection, Water And Sewage, Central Heating And Telecommunications Installations. The Scope Of The Study Includes: A) Insulation Of The Building Complex, Including Insulation Of The Ceiling, Flat Roof, External Walls, Foundation/Basement Walls And Plinth, B) Demolition, Reconstruction And Extension Of External Stairs, Including A Ramp For Disabled People. C) Reconstruction Of Some Rooms, Including The Demolition Of Two Underground Rooms In The Basement D) Replacement Of Window And Door Joinery And Renovation Of Internal Jambs And Replacement Of Window Sills E) Demolition Basement Skylights, Including The Installation Of System Skylights. F) Installation Of Facade Stucco Elements, G) Construction Of An Underground Gas Tank With A Capacity Of 4,850 L, Construction Of Internal And External Gas Installations, H) Installation Of A Gas Boiler With A Closed Combustion Chamber With A Power Of 38 Kw (Qmax = 1.4 M3/H) I) Partial Replacement Of The Central Heating Installation) Replacement Of Gutters, Downpipes, External Ladder And Lightning Protection System,K) Disassembly And Reassembly Of External Lighting,L) Disassembly And Reassembly Of External Units Of Air Conditioning Systems,M) Replacement Of The Electrical Switchboard And Telecommunication Box,N) Replacement Of Balustrades And Replacement Of Roofs Over The Entrances To The Building,O) Plastering Of Chimneys,P) Hardening With Concrete Blocks And Biologically Active Surface. As A Result Of Insulation, The Building Area Of The Building Complex Will Increase By The Area Of Thermal Modernization From 405.00 M2 To 414.65 M2. The Works Should Be Carried Out In A Way That Is Least Burdensome And Does Not Interfere With The Work Of The Commune Office. The Acceptance Of A Gas Tank With A Capacity Of 4,850 Liters By The Office Of Technical Inspection Is The Responsibility Of The Contractor.
|