Construction Work – Construction Of Charging Points As Part Of The Project Purchase Of Zero-Emission Extra-Urban Buses For The Podegrodzie Commune. 4.1. The Subject Of The Order Is The Design And Construction Of Charging Points Along With The Necessary Infrastructure For Extra-Urban Buses For The Podegrodzie Commune. Name Of The Order: Construction Of Charging Points As Part Of The Project Purchase Of Zero-Emission Extra-Urban Buses For The Podegrodzie Commune. 4.2. Subject Of The Order According To Cpv: 31158000-8 Chargers, 45310000-3 Electrical Installation Works, 45317000-2 Other Electrical Installations, 71320000-7 Engineering Design Services, 45000000-7 Construction Works, 45232200-4 Auxiliary Works In The Field Of Power Lines, 45231400-9 Construction Works Relating To Power Lines, 45311000-0 Works Relating To Cabling And Electrical Installations, 45310000-3 Works Relating To Electrical Installations, 45315300-1 Electrical Supply Installations, 45317000-2 Other Electrical Installations, 45213314-7 Construction Works Relating To Bus Depots, 45233000-9 Works In The Field Of Construction, Foundations And Paving Of Highways And Roads, 45111291-4 Works In The Field Of Land Development, 45112710-5 Works In The Field Of Shaping Green Areas, 71220000-6 Architectural Design Services, 71323100-9 Design Services Of Electricity Supply Systems. 4.3. The Order Includes: A) Construction Of 5 Charging Points With A Capacity Of 50 Kw Each, An Installation With A Capacity Of 50 Kwh With A Hybrid Inverter For Each Point, An Energy Storage Facility With A Capacity Of Approximately 50 Kw And A Charger With A Capacity Of Kw, B) All Design Works Including Demolition, Construction, Installation And Finishing Works, Together With Obtaining The Opinions, Approvals And Permits Required By Law (Including Construction Design, Detailed Design, Stwior, Investors Cost Estimate, Arrangements With A Fire Protection Expert, Obtaining The Office Of Technical Inspection For An Electric Vehicle Charging Point, Reporting The Micro-Installation To Td S.A. And Positive Connection To The Td S.A. Network) To The Extent Necessary For The Effective Implementation Of The Investment Task, C) Construction Of Electric Vehicle Charging Points With Accompanying Infrastructure In The Town Of: - Długołęka Świerkla, Plot No. 337, - Olszana, Plot No. 327/2, Podegrodzie, Plot No. 663/1, Podrzecze, Plot No. 418/11, 416/15, 413/3. D) Employee Training. A Detailed Description Of The Subject Of The Order Is Set Out In The Functional And Utility Program (Ffu), Annex No. 10.1, 10.5, 10.10, 10.14 And Annexes No. 10.2 - 10.4, 10.6 - 10.9, 10.11 - 10.13, 10.15 - 10.18 10.1 - 10.18 To Swz. 4.5. Requirements For Charging Infrastructure: 1) Zero Emission And Energy Efficiency • Charging Stations Will Be Adapted To The Use Of Energy From Renewable Sources (Res) And Equipped With Intelligent Energy Load Management Systems. • Technologies That Minimize Energy Loss During Charging Will Be Used To Increase Energy Efficiency. 2) Resistance To Weather Conditions • Charging Stations Will Be Protected Against Extreme Weather Conditions
|