Ventilation Installation Work – School An Der Ruhr, Mintarder Weg 43, Ventilation Technology. The Subject Of The Measure Is The Construction Of The Ventilation Systems. Ventilation Takes Place Via Central Air Conditioning Systems For The Main Building And The Gymnasium As Well As Via Separate Exhaust Systems For The Kitchen. The Systems Ensure Compliance With The Required Air Exchange Rates, Indoor Air Quality And Hygienic Requirements In Accordance With Din, Vdi And Dguv. Air Is Distributed Via Sheet Metal Ducts And Ventilation Pipes With Adjustable Passages, Pneumatic Balancing And Fire Protection Measures. Zulu?, Ablu? And Heat Supply Are Controlled Zone By Zone, Including Heat Exchanger, Heating Registers, Ec Fans And Optional Natural Night Cooling. All Installations Are Checked, Carried Out In Accordance With Fire Regulations And Adapted To The Usage Requirements. Main Volumes Ventilation System Hg Approx. 25,000 M3/H Ventilation System Gym Approx. 3,800 M3/H Duct Network 2,255 M2 Air Outlets 348 Pieces Fire Dampers 65 Pieces Volume Flow Controllers 124 Pieces
Contact Information
Address
Lindenallee 68
Contact No.
+49 20188-60132
Email
vergabe@immo.essen.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 107722742
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.