1. The Subject Of The Order In This Procedure Is The Development Of The Area Next To The Municipal Cultural Center In Skarbimierz - Housing Estate At Ul. Akacjowa On Plot No. 19/55 And 167/13 In The Following Scope: A) Liquidation And Leveling Earthworks B) Construction And Water Works: Completion Of The Construction Of A Water Cascade, Fountain, Pond And Construction Of A Wooden Bridge (Pressure Impregnated Oak Wood) Electrical Installation Of Power Supply And Control Of The Fountain (Delivery And Installation Of Control Boxes [Ip65] For A Cascade And A Fountain And 1 Submersible Pump With A Mesh Filter. Laying Power Cables (Yky 5X16mm², Yky 5X10mm², Yky 5X4mm²). /10X15x60cm/ In The Color Of Yellow Sandstone. The Palisade Must Be Raised 25 Cm Above The Cascade Surface, And The Walls Of The Lawns Should Be Lined With Foil To The Height Of The Fertile Soil. Plantings (The Project Envisages Planting A Total Of 881 Coniferous Trees And Shrubs, 556 Deciduous Shrubs And 568 Ornamental Grasses And Perennials. The Plant Material Must Meet The Recommendations Quality For Decorative Nursery Material). Mulching (Borders With Shrubs Should Be Lined With Geotextile (Weight: Min. 90 G/M²/) And Mulched With White White Marianna Grit). Lawns (10-15 Cm Thick) Sown On A Layer Of Vegetation Substrate). 50L)D) Road Works And Hardening: Surface: Made Of Yellow Nosolite Paving Stones, With Rounded Edges And Narrow Joints. On The Edges Of The Sidewalk, Strips Of Gray Cubes, 24 Cm Wide, Should Be Used (Dimensions 12X9 Cm, 12X12 Cm, 12X18 Cm), Cube Thickness 8 Cm. E) Construction Of External Lighting. Area (Delivery And Installation Of 20 Park Lanterns (H = 5 M) With Led Fixtures)2. The Ordering Party Requires That, Before Submitting An Offer, Each Of The Contractors Applying For This Contract Must Undergo An On-Site Visit In Order To Assess, On Their Own Responsibility, Cost And Risk, All Factors Necessary To Prepare A Reliable Offer, Including All Necessary Preparatory, Essential And Accompanying Works To Carry Out Construction Works.3. The Application For Participation (Appendix No. 10) In The On-Site Visit Should Be Sent In The Manner Specified In Chapter I Swz, Via The Platform On Which The Proceedings Are Conducted No Later Than January 27, 2026, 08.004. The Ordering Party Sets One Date For The Contractors To Undergo The Above-Mentioned Inspection, I.E.: January 27, 2026, At 09:00, Meeting Place: Cultural Center, Skarbimierz- Osiedle Ul. Akacjowa 27A5. Contractors Applying For The Contract Are Obliged To Participate In The Visit.6. The Ordering Party Will Prepare A Report On These Activities, Including, Among Others: Information About The Participants Of The Visit (Annex 10A). This Document Will Be The Basis For Assessing The Fulfillment Of This Criterion By Contractors At The Offer Evaluation Stage. Contractors Are Solely Responsible For Examining The Swz With Due Diligence And For Familiarizing Themselves With Any Possible Modification Of The Swz Issued Durin
Contact Information
Address
Gmina Skarbimierz,Skarbimierz-Osiedle,49-318,Opolskie,Pl523 - Nyski
Email
inwest@skarbimierz.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 107688034
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.