|
1. Subject Of The Orderthe Subject Of The Order Is The Construction Of An External Elevator At The Building Of Primary School No. 1 In Ełk As Part Of The Project Improving Accessibility At Primary School No. 1 In Ełk, Which Received Funding From The Regional Program Of The European Fund For Warmia And Mazury 2021-2027. The Investment Area Is Not In A Conservation Protection Zone. Construction Works Will Be Carried Out On An Active Educational Facility. Thermal Modernization Works Of The Entire Facility Are Being Carried Out According To A Separate Order.1.1. The Scope Of The Order Includes: A) Preparatory Works, B) Securing The Construction Site, C) Execution Of Demolition Works, Including Removal And Disposal, D) Execution Of Earthworks, Including Removal And Disposal, E) Construction Of Reinforced Concrete Foundations For The Elevator Shaft, F) Construction Of An Elevator Shaft With A Steel Structure, G) Construction Of A Glass Casing For The Elevator Shaft With A Roof And Sheet Metal Covering Coated, H) Connecting The Elevator Shaft With The Existing Facility, I) Installation And Commissioning Of An Elevator For Disabled People With The Following Parameters: • Pass-Through Cabin With An Area Of At Least 1.7 M2, • Four-Stop Cabin, • Load Capacity: Min. 400Kg (5-Seater),• Stainless Steel Equipment,• Led Lighting,• Ventilation Of The Elevator Shaft,• Screw Drive,• Safety Equipment Of The Elevator Shaft And The Cabin,• Connecting The Crane To The Main Switchboard With A Cable Of Min. Yky 5X6mm, Approx. 30M Long, • Expansion Of The Main Switchboard.J) Disassembly Of External Windows With A Knee Wall - 4 Pcs. K) Construction Of A New Entrance To The Building, L) Replacement Of External Doors - 1 Pc. (Passage Opening 120 Cm, U<1.3W/M2k) M) Installation Of Sliding Doors Adapted To The Elevator - 3 Pcs. (U<1.3W/M2k)N) Carrying Out Finishing Works, I.E. Plastering, Two-Time Filling And Painting From The Inside And Plastering From The Outside, O) Demolition Of External Concrete Stairs With An Area Of Approximately 2 M2 And A Surface Made Of Paving Slabs With An Area Of 72 M2, P) Construction Of New Outdoor Stairs From Prefabricated Concrete Elements, I.E. A Concrete Palisade Thick. 12Cm, Concrete Rim 8X30cm And Concrete Cubes Thick. 6 Cm On An Aggregate And Cement Base With An Area Of 2 M2,Q) Hardening The Area With A Surface Made Of Concrete Cubes, Thickness. 6 Cm On An Aggregate Base Surrounded By 6X20 Cm Concrete Edges With An Area Of 85.0 M2, R) Designating A Place For Disabled People Through Vertical And Horizontal Marking, S) Restoring Damaged Or Devastated Paved Surfaces And Green Areas To Their Original Condition After Construction Works, T) Cleaning The Area After Construction Works, U) Preparing As-Built Documentation In Two Copies, Including: • Design Technical Specifications Of The Elevator Shaft With The Elevator Prepared By Authorized Persons In Accordance With The Construction Law, • Decision Of The Office Of Technical Inspection To Auth
|