1. The Subject Of The Order Is The Implementation Of The Task Entitled: Expansion Of The Sewage Treatment Plant In The Town Of Krzywda Along With The Construction Of A Sanitary Sewage System Consisting In The Expansion Of The Sewage Treatment Plant In The Town Of Krzywda, Commune. Krzywda Together With The Construction Of A Sanitary Sewage Network And The Replacement Of Water Meters With A Remote Reading System In The Towns Of Radoryż Smolany, Radoryż Kościelny And Krzywda, Commune. Krzywda, In The Design And Build Formula, The Planned Investment Will Be Implemented In The Krzywda Commune - Sewage Treatment Plant: Town: Krzywda, Plot No. 284/3, Krzywda Commune, Łuków Poviat - Sanitary Sewage Network: Places: Radoryż Smolany Commune. Krzywda - Plot No. 1116/9 (Connection Of The Sanitary Sewage System), 1136/2, 1140; Radoryż Kościelny Commune Krzywda – Plot No.: 322; Krzywda, Commune Krzywda – Ul. Żelechowska, Plot No. 1343, 1142/2 (Connection To The Sewage Collector). The Task Of The Design Part Includes, Among Others: - Information Card Of The Project, And If The Authority Competent To Issue A Decision Imposes Such An Obligation - A Report On The Impact Of The Project On The Environment, - Land Development Design, - Architectural And Construction Design, - Technical Designs. The Task Of The Construction Part Includes, Among Others: In The Scope Of Expansion Of The Sewage Treatment Plant: > Reconstruction Or Construction Of A First-Stage Pumping Station > Reconstruction Of A Sand Trap Sieve Using An Existing Device - Construction Of A Technological Building To Which It Should Be Moved Sietopiakownik> Construction Of A Second Stage Pumping Station> Construction Of 3 Cylindrical Sbr Reactors With An Integrated Retention Tank Each.> Construction Of A Hermetic Catchment Station For Supplied Sewage> Adaptation (Reconstruction) Of The Existing Biological Reactor With A Settling Tank Into A Tank For Aerobic Sludge Stabilization And A Retention Tank For Supplied Sewage> Modernization Of The Technological System Of The Treatment Plant, Modernization Of The Blower Station, Technological Room And Sludge Dewatering Station, Modernization Of Equipment Control And Measurement And Automation And Integration Into The Existing Technological Process Monitoring System,> Reconstruction Of The Collector Discharging Treated Sewage Into A Drainage Ditch, Inserting A Well With A Flow Meter To Measure Purified Sewage> Increasing The Connection Power To The Target Value> Installation Of A Stationary Power Generator In A Sound-Absorbing Casing - Open-Air Variant> External Infrastructure, Construction Of Systems: Closed-Circuit Television, Cctv System Swn Burglary Alarm, Access Control, Reconstruction Of External Lighting, > Land Development: Allocating Space For Waste Storage (Screenings, Sand, Municipal Waste), Reconstruction Of The Sludge Plot, Reconstruction Of The Fence, Construction Of A Technological Square From Concrete Cubes, Tidying Up The Construction Site. Note:
|