Dyke Construction Work – Hwsb Right Aland Dike Wahrenberger Bridge - Pollitz Bridge Km 11.8 - 14.0 Dike Construction. The Saxony-Anhalt State Office For Flood Protection And Water Management Is Planning To Renovate The Existing Aland Dike In The Aland Lowland Area, North Of Osterburg. In The Dike Section Under Consideration, Approximately 2,200 M Of Dike Are Being Renovated. The Following Geometry Of The Renovated Dike Body Was Assumed For The Possible Solution Shown In The Site Plan. The New Dike Crown Width Is 3.0 M. The Embankments Have A Continuous Slope Of 1:3. The Dike Surface Will Again Be Seeded With Grass. The Missing Dike Volume Is Compensated For With Aueton. No Separate Dike Seal Will Be Installed As The Existing Dike Is Made Entirely Of Aueton. Only In The Transition Area To The New Dike Construction Stat. 2+166…2+176.7 A Dike Seal Is Installed. The Dike Defense Path Will Be Laid Out On The Land Side On A 5.0 M Wide Berm With Concrete System Paving. Ramps And Crossings Will Have An Inclination Of 1:10. Deep Rims On The Water Side In The Crown Area, On The Land Side At The End Of Ascents, Crossings And Descents. Woods Are Removed Up To At Least 5.0 M On Both Sides Of The New Dike Base. To Relieve Pressure, A Relief Slot Is Installed In The Landside Dike Protection Strip. According To The Task, The Renovation (Construction Station 0+000.00…2+176.00, Own Construction Station) Will Be Carried Out In The Existing Dike Route. General: - Dike Renovation Approx. 2,200 M Services: - Mowing And Milling Approx. 107,150 M² Of Removal Areas - Erecting And Maintaining Approx. 2,750 M Of Amphibian Protection Fence - Removing Approx. 107,150 M² Of Topsoil, 0.30 M Thick, Transport Up To 2000 M - Approx. 97,000 M² Of Topsoil Application, 0.30 M Thick, Transport Up To 2000 M - Approx. 15,200 M³ Loosen Cohesive Soil, Load Transport Up To 2,000 M - Approx. 15,000 M³ Loosen Non-Cohesive Soil Transport Up To 2,000 M - Approx. 35,020 M³ Deliver Non-Cohesive Soil - Approx. 12,750 M³ Install, Compact, Transport Cohesive Soil Up To 2000 M - Approx. 31,000 M³ Install Non-Cohesive Soil, Compact It, Up To 2 Km Transport - Approx. 8,500 M³ Dispose Of Excess Soil - Approx. 3,500 M³ Deliver, Install Gravel Base Layer 0/45 Mm - Approx. 2,600 M³ Existing Pick Up The Base Layer, 2 Km Transport, Install - Pick Up Approx. 5,500 M² Of Concrete Road Slabs, Break Grain 0/45 Mm - Deliver And Lay Approx. 8,900 M² Of Concrete System Paving, Angle Stones - Produce Approx. 220 M² Of Asphalt Base Layer - Produce Approx. 167,000 M² Of Fine Subgrade + Grass Seeding - Deliver Approx. 160 M Of Deep Board, Install - Dewatering
|