|
Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Mechanized Landfill With 1St Category Material, Spread With A Backhoe, In Layers Of 20Cm, Using Compactor Roller, With The Intervention Of 2 Servants, Including Irrigation And Landfill Material, Siding With Metallic Tile. Af_03/2024, Electricity Input, Overhead, Three-Phase, With Recessed Box, 10 Mm2 Cable And Din 50A Circuit Breaker (Concrete Post Not Included). Af_07/2020, Temporary Water And Sewage Connection, Conventional Lease Of Work, Using Template Of Pointed Running Boards Every 2.00M - 2 Uses. Af_03/2024, Mechanized Cleaning Of Plant Layer, Vegetation And Small Trees (Trunk Diameter Less Than 0.20 M), Using A Tracked Tractor. Af_03/2024, Local Administration, Rental Of Container 2, 30 Mobilization/Demobilization) (Month), For Toilet, With 4 Basins, 8 Showers, 1 Washbasin And 1 Urinal (Does Not Include Mobilization/Demobilization) (Month), Mechanized Excavation For Crowning Block Or Footing With Backhoe (Including Excavation To Place Formwork). Af_01/2024, Mechanized Excavation For Baldrame Beam Or Running Footing With Mini-Excavator (Including Excavation For Placing Formwork). Af_01/2024, Mechanized Trench Backfilling With Backhoe Loader (Retro Bucket Capacity: 0.26 M³/Power: 88 Hp), Width 0.8 To 1.5 M, Depth 1.5 To 3.0 M, With 1St Category Soil (Without Replacement) And Percussion Soil Compactor. Af_08/2023, Preparation Of The Bottom Of A Trench With A Width Greater Than Or Equal To 1.5 M And Less Than 2.5 M (Natural Soil Adjustment). Af_08/2020, Mobilization Of Equipment - Pre-Cast Piles, Driving Of Pre-Cast Concrete Pile Square Section 23 Af_12/2019, Driving Of Precast Concrete Pile Square Section 26 Af_01/2024, Lean Concrete For Ballast, Mixture 1:4, 5:4, 5 (In Dry Cement Mass/Medium Sand/Gravel 1) - Mechanical Preparation With 600 L Concrete Mixer. Af_05/2021, Manufacture, Assembly And Dismantling Of Formwork For Crowning Block, In Sawn Wood, E=25 Mm, 4 Uses. Af_01/2024, Block Frame Using 8 Mm Ca-50 Steel - Assembly. Af_01/2024, Block Frame Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024, Block Frame, Insulated Footing, Baldrame Beam And Running Footing Using 12.5 Mm Ca-50 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 16 Mm Ca-50 Steel - Assembly. Af_01/2024, Concreting Of Crowning Block Or Baldrame Beam, Fck 30 Mpa, Using A Pump - Laying, Densifying And Finishing. Af_01/2024, Framing Of Miscellaneous Reinforced Concrete Structures, Except Beams, Pillars, Slabs And Foundations, Using 5.0 Mm Ca-60 Steel - Assembly. Af_06/2022, Block Frame Using 6.3 Mm Ca-50 Steel - Assembly. Af_01/2024, Assembly And Disassembly Of Formwork For Baldrame Beam, Insulated Footing Frame, Baldrame Beam And Running Footing Using 6 Mm Ca-50 Steel, Baldrame Beam And Running Shoe Using 8 Mm Ca-50 Steel - Assembly. The
|