|
Tender for Acsr 6/1/3.35 (50Mm²) {Includes 3 Conductor Lengths For 3F And Inclusive 3% (Sag, Jumpering And Wastage} , 11M Steel Tublar Pole (11 M, Working Load 227 Kgf/M²) (With Ruling Span 90 M, 8 No. Run Thro And 3 No. Double Pole Dead End Structures) , Muffs With Concerete Filling , Cross Arm: [Channel Iron (100X50x6 Mm), Length: 1525 Mm I/C Tolerance Of 100 Mm Either Side) X 8 Structure , Angle Iron (50X50x6 Mm), Length: 750 Mm X 2 No. X 8 Structures , Pole Top Bracket [Msci:100X50x6 Mm- 100 Mm] , 22 Kv Pin Insulators With Gi Pin(Porcelain, 24 Kv, 10 Kn): 3 No Per Pole Structure , Belt Set - Ms Angle Iron: 50X50x6, Length :1800 Mm X 2 No. , X-Bracing Set - Ms Angle Iron: 50X50x6, Length: 2125 Mm X 2 No. , X-Arm (Horizontal) - Ms Channel Iron: 100X50x6, Length: 2340 Mm X 2 No.] ? Formation , Discs Insulator Sets On Dead End Structures (Comprising 1 No. Disc: ^^(Porcelain, Bs, 24 Kv, 90 Kn) Including Dead End Clamps Etc.) X (3 No. Conductors) X (2 No. Sides) , 22 Kv Pin Insulators (Porcelain, 24 Kv, 10 Kn): 3 No Per Double Pole Structure , Stay Set Complete In All Respect (1No. / Single Pole , 4 No. / Double Pole Structures) , Stay Wire (7/3.15 Mm) (10.0 Kg Per Stay Set) , Ht Earthing Set Complete (Rec construction Stand. J-1) , Single Continous Earth Wire (Gi, 8 Swg) {Alongwith 2 Wire Lengths For Avg. One Road Crossing @ 20 M And Additional 1% (Sag And Wastage)} @ 0.102 Kg/M , Cross Lacings (Gi, 8 Swg) [ 2.2 M X 9 Nos @ 2 M Spacing] {0.102 Kg/M} , Eye Hook For Earth Wire , Earth Wire Clamp , Ms Channel Iron: 75X40x6, Length : 2400 Mm For Road Crossing , Half Clamps: [On Double Pole Dead End Structure: 4 No; On Run Thro Structure: 2 No ] , Full Clamps: [On Double Pole Dead End Structure: 4 No, Single Pole Run Thro Structure: 2 No] , Danger Plate , Nuts And Bolts Of Various Sizes (Galvanised / Coated) [Preferably 16 Mm F Or More (With Flat And Spring Washers)] , Barbed Wire , Red Oxide , Aluminium Paint , Go Switch Handle Supporting: [Channel Iron (75X40x6 Mm), Le
|