|
1. The Subject Of The Order Is The Execution Of Construction Works Consisting In The Construction Of A Free-Standing, Single-Story Transfer Center Building, Including All Internal Installations And Full Internal And External Finishing, As Well As The Necessary Equipment In Accordance With The Design Documentation And Applicable Regulations. The Scope Of The Order Also Includes: Relocation Of The Existing Energy Storage Facility To A Building Located Within The Transfer Center, Expansion Of The Above-Mentioned Warehouse, Connecting The Planned Sound System To The Existing Platform Sound System, Locating An Information Board Inside The Building With Access To Information About Train Timetables, As Well As Installing Automatic Doors. 2. The Order Includes The Execution Of Construction Works In The Scope Of: 1) Construction And Finishing Works: A) Excavations, B) Construction Of A Foundation Slab, C) Construction Of Walls From Ceramic Blocks, D) Insulating The Walls With Mineral Wool, E) Construction Of A Façade Made Of Standing Seam Sheet Metal And Composite Panels, F) Construction Of A Roof Truss Made Of Glued Wood, G) Construction Of A Roof Covering, H) Installation Of Window Joinery And Doors, I) Execution Of Floors, Ceilings And Finishes. 2) Internal Installations: A) Water Supply Installation, B) Sewage Installation, C) Electric Heating, D) Ventilation And Air Conditioning Installation, E) Electrical Installation, F) Sound System, G) Installation Of A Board With Access To Railway Information. 3) Fire Protection: A) Building Fire Resistance Class D, B) Structural Elements R30, C) External Walls Ei30, D) Ceiling Ei30 In The Technical Room, E) Emergency And Evacuation Lighting, F) Equipment: Gp-6X And Gs-5X Fire Extinguishers, Fire Blanket. 3. The Building Will Be Equipped With A Building Management System, As Well As Equipment Necessary To Service Passengers, Including An Info Kiosk With Internet Access, Which Will Enable Access To, Among Others, To Timetables.
|