The Subject Of The Order Is The Construction And Reconstruction Of An Internal Road In Międzyzdroje, District 0019.2.2. The Following Construction Works Will Be Performed As Part Of The Task: • Construction Of An Exit From The Provincial Road (In Accordance With The Design Documentation). • Construction And Reconstruction Of A Section Of The Internal Road (In Accordance With The Design Documentation). • Dismantling The Surface Of Concrete Road Slabs And Transporting Them To The Place Indicated By The Ordering Party In The City Of Międzyzdroje. • Construction Of A Sidewalk (In Accordance With The Design Documentation). • Construction Of Street Lighting (In Accordance With The Design Documentation). It Is The Contractors Responsibility To Notify The Network Operators: Telecommunications, Power Plant, Gas Plant, Zwik, Telecommunications Companies About The Planned Start Date Of The Investment, Having Their Infrastructure Within The Road, Supervision Of The Above-Mentioned And Presenting Any Acceptance Protocols - If Required. A Detailed Description Of The Subject Of The Order Is A Construction And Executive Design, Technical Specification Execution And Acceptance Of The Works, And On This Basis The Offer Should Be Valued. The Subject Of The Order Also Includes All Other Activities, Not Expressly Specified In The Description Of The Subject Of The Order, Which, For Technical, Technological Or Organizational Reasons, Are Or Will Become Necessary To Perform The Works Described In The Technical Documentation And In The Technical Specification For The Execution And Acceptance Of The Works, Including, Among Others, The Costs Of Felling Trees, Adjustment Of Existing Surfaces Along With Ground Devices Of Underground Utilities, Adapting To The Level Of The Designed Surface Of Exits And Pedestrian Routes On Properties Adjacent To The Road, Adjustment Of Elements Fences, Entrance Gates And Wickets, Repair Of Fence Plinths Resulting From Lowering Or Raising The Area Adjacent To Existing Fences, Framing The Sidewalk From The Side Of Properties Adjacent To The Road Along The Entire Length Of The Sidewalk Using Sidewalk Edges, Removing Possible Collisions Between The Newly Built Sanitary, Rain And Water Sewage Networks With The Existing Underground Infrastructure, Making A Switch, Connecting The Existing Infrastructure To The Newly Built Networks Within Both Right-Of-Way And Properties Adjacent To The Right-Of-Way (Connections To Sanitary Sewage Systems, Rainwater And Water Supply Systems), In The Event Of Removal Of Conflicts Or Liquidation Of Networks, Water And Sewage Connections, Both Inventoried And Uninvented, And Colliding With The Newly Constructed Infrastructure, The Remaining Infrastructure Elements Should Be Dismantled Or Secured, They Should Be Connected To Existing Connections On The Property, Acceptance, Approvals, Tests, Preparation Of Documentation As-Built, Replacement.
|