1) Part I - Construction Of The Water Supply Network In Gorzków Osada A) Data Regarding The Task: The Task Will Be Implemented In The Design And Build Mode. Construction Works Should Be Performed In Accordance With The Construction Design Developed By The Contractor, Bills Of Quantities Developed During The Task Implementation And Approved By The Ordering Party. B) Basic Parameters Of The Existing Water Supply System: The Pipework Of The Water Supply Network In The Area Of Gorzków-Osada Is Made Of Many Materials Whose Service Life Is Approaching 50 Years. There Are Steel, Asbestos-Cement, Pvc And Pe Pipes. Recently, There Have Been More And More Frequent Failures Indicating The Deteriorating Condition Of The Network. There Is Also A Noticeable Increase In Water Losses. The Route Is Approximate, And The Ordering Party Allows For Changes To The Planned Route After Prior Approval Of The Submitted Construction Design. Construction Of A Water Supply Network On Plots No. 465, 466, 467, 468, 469, 470/2, 384, 481, 480/1, 479/3, 479/1, 478, 477/2, 477/6, 477/8, 477/5, 452/2, 540, 452/3, 451/3, 448, 447, 446, 445, 441, 541, 441, 439/1, 439/2, 409, 410/2, 410/4, 410/3, 535, 533, 385/1, 385/4, 385/3, 537, 538/2, 411/4, 462, 460 453, 455/2, 562/2, 562/1, 476/1, 475, 474/1, 474/3, 473, 560, 471/1, 381, 363/14, 534, 532/4, 433, 430, 431, 432, 377, 378, 376, 375, 374, 373, 372, 369, 368, 367, 366/2, 366/1, 365, 364/4, 532/3 364/3, , 364/1, 363/13, 363/14, 363/7, 532/1, 363/11, 363/12, 363/10, 529, 324, 356/2, 356/1, 356/2, 355/3, 355/4, 355/5, 355/6, 382/1, 382/6, 354, 353, 352, 382/5, 351, 357/2, 359/1, 358, 360/3, 362/12, 362/10, 362/8, 323, 316, 315, 314, 313, 312/1, 311, 310, 360/5, 360/10, 528/2, 551, 183, 184/3, 491/3, 491/2, 187/3, 309, 308, 307,187/2, 288, 284, 185, 395, 394, 393, 392, 391, 599, 390, 389, 386/1, 534, 416, 415, 414, 395, 398, 399, 400/2, 401/2, 402, 292, 535, 476/2, 543, 449, 448, 447, 446, 445, 442, 440, 439/1, 536, 409, 408 District Gorzków-Osada.C) Scope Of Work Performed: As Part Of This Task, Complete Design Documentation Must Be Prepared Along With Obtaining A Construction Permit On Behalf Of The Ordering Party (The Ordering Party Will Provide The Contractor With Appropriate Authorization) And Carry Out The Works Necessary To Achieve The Goals Described In This Functional And Utility Program (Ffu) The Scope Of The Works Covered By The Contract Is: A. Design: - Network Water Supply For The Streets Of Rynkowa, Nowa, Cicha, Nadrzeczna, Partyzonów, Along With Connections To All Existing Buildings, As Well As The Construction Of Points Enabling The Connection Of The So-Called Indents In The Form Of Installing Drills For Pe/Pvc Pipes With A Gate Valve On The Pipeline, And Their Appropriate Protection And Marking At Ground Level. The Network Route Is Consistent With The Proposed Location Indicated In The Map Annex, Subject To Compliance With Legal Requirements And Applicable Standards And Good Practices. Number Of Connections 111 P
|