The Existing Broadcasting Museum In Fürth Will Be Renovated And Supplemented With A New Building. The Floor Slab, The Ceilings And The Load-Bearing Walls Are Made Of Concrete. The Rest Interior Walls Are Made Of Drywall And Masonry Executed. The Heating Center Is Located In The Basement. This Is Where The Ahu For This Floor Is Located Mounted On The Ceiling. The Channel Routing Takes Place On The Blanket. The Silencers For The Recording Studio Must Meet The Requirements Of The Recording Studio Builder. The Fire Dampers Are In Accordance With The Specifications Install Fire Protection Planning. From The Ground Floor To The 2Nd Floor There Will Be A Floor Standing Unit On Each Floor Rlt Device With Electric Heating Register Installed. The Control Of The Air Conditioning Systems Should Be Central In The Heating Center Converge. The Distribution To The Risers Takes Place At The Ceiling Of The Floors. The Entire Installation In The Building There Is Warping Across The Ceiling.
Contact Information
Address
Hirschenstraße 2, 90762, Fürth
Email
vergabestelle@fuerth.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 107571401
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.