|
Local Administration Of The Work Sinapi Composition 001 Local Administration Of The Work, Supply And Installation Of Work Sign Sinapi 103689 Supply And Installation Of Work Sign With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Mobilization / Demobilization Of Equipment Mobilization / Demobilization Of Equipment Sinapi Composition 002 Mobilization / Demobilization Of Equipment, Demolition Sinapi 97636 Partial Demolition Of Asphalt Pavement, Mechanized, Without Reuse. Af_09/2023, Sinapi Cleaning 99814 Surface Cleaning With High Pressure Jet. Af_04/2019, 01/16/2026 - 11:20:55, 01/16/2026 - 11:20:57, 01/16/2026 - 11:20:58, Sinapi Painting Execution 104375 / The Execution Of Connection Painting With Asphalt Emulsion Rr-1C (Exclusive Emulsion), Execution Sinapi 95995 / A1 Execution Of Reprofiling With Application Of Asphalt Concrete (Cbuq - 3Cm) With Motor Grader - Exclusive Machining, Loading And Transport, Execution Of Sinapi 95995 / A2 Execution Of Pavement With Application Of Asphalt Concrete (Cbuq - 4Cm) - Exclusive Machining, Sinapi Asphalt Concrete Machining 104359 / Asphalt Concrete Machining With Cap 50/70, For Bearing Layer, Dnit Standard Range C, In 80 Ton/H Continuous Asphalt Plant - Exclusive Cap, Sinapi Asphalt Mixing Load 101002 Load Of Asphalt Mixture In Dump Truck 10 M³ (Unit: T). Af_07/2020, Sinapi Transport 95878 Transport With 10 M³ Dump Truck, On Paved Urban Road, Dmt Up To 30 Km (Unit: Txkm). Af_07/2020, Sinapi Transport 102330 Transport With 30000 L Asphalt Material Transport Tank Truck, Dmt Up To 30Km (Unit: Txkm). Af_07/2020, Sinapi Transport 102331 Transport With 30000 L Asphalt Material Transport Tank Truck, Additional For Dmt Exceeding 30 Km (Unit: Txkm). Af_07/2020, Asphalt Emulsion Quote 001 Cationic Asphalt Emulsion Rr-1C, Asphalt Cement Quote 002 Petroleum Asphalt Cement (Cap 50/70) In Bulk, Sinapi Demolition 97636 / Partial Demolition Of Basalt Walkway, With Floor Cutter, Without Reuse, Demolition Sinapi 97633 / Demolition Of Basalt Walkway Manually, With Reuse, Removal Sinapi 97635 Removal Of Interlocking Block Or Portuguese Stone Flooring, Manually, With Reuse. Af_09/2023, Sinapi Demolition 104790 Simple Concrete Floor Demolition, Mechanized With Hammer, Sinapi Excavation 90100 Mechanized Trench Excavation With Prof. Up To 1.5 M (Average Upstream And Downstream/One Composition Per Section), Backexcavation. (0.26 M3), Width. From 0.8 M To 1.5 M, On 1St Category Soil, In Locations With A High Level Of Interference. Af_09/2024, Preparation Of The Bottom Of A Trench Sinapi 101617 Preparation Of The Bottom Of A Trench With A Width Greater Than Or Equal To 1.5 M And Less Than 2.5 M (Adjustment Of The Natural Soil). Af_08/2020, Sinapi Execution 92396 / The Execution Of A Walkway On An Interlocking Floor, With A Natural Color Rectangular Block Of 20 Interlocking Floor, With 16-Sided Block Of 22 Sinapi Maneuvering And Unloading 100974 Loading, Maneuvering And Unloading Of Soil And Granular Materials In A 10 M³ Dump Truck -
|