Construction Work For Tunnels, Shafts And Subways – Spezialtiefbau 110Kv Kabelsysteme Am Plärrer. N-Ergie Netz Gmbh Intends To Upgrade The 110 Kv Transmission Lines Within The Grid Area For The Energy Transition. In This Context, The Old 110 Kv Cables In The Nuremberg City Area Are Being Replaced With New, More Powerful Cables. The Crossing Under The Plärrer With The Existing Subway Structures Required For Implementation Is Carried Out Using A Special Civil Engineering Method Using A Closed Construction Method. The Cable Routes Under The Plärrer Were Determined By N-Ergie. Cable Laying Is Carried Out Exclusively Using The Tunneling Method. For This Purpose, Start And Target Pits Are Created For The Tunneling. Complete Production Using Tunneling (Mining) Makes Economical And Technical Sense, As The Special Construction Site Equipment Required Is Already On Site For Crossing Under The Subway Structures. It Is Therefore Possible To Use The Construction Site Equipment Efficiently For The Route Section In Between. At The Same Time, The Disadvantages Of Open Laying (Corresponding Interventions On The Surface, Divisions, Traffic, Etc.) Are Minimized.
Contact Information
Address
Sandreuthstraße 21
Contact No.
+49 91180258413
Email
jonas.wunder@n-ergie.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 107565639
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.