|
Refuse And Waste Related Services – Collection, Transport And Management Of Prerdf Components For The Production Of Alternative Fuel, I.E. Waste With Code 19 12 12. 1. The Subject Of The Order Is The Successive Collection, Transport And Management Of Prerdf Components For The Production Of Alternative Fuel, I.E. Waste With Code 19 12 12, Produced At The Ordering Partys Plant. The Proposed Management Method Must Be Carried Out In A Manner Consistent With The Hierarchy Of Waste Management Methods, In Particular With The Recovery Processes Described In Annex No. 1 To The Act Of December 14, 2012 (Consolidated Text: Journal Of Laws Of 2023, Item 1587, As Amended). For The Production Of Components For The Production Of Alternative Rdf Fuel, Ballast Is Used After The Separation Of Fractions 80-300 Mm And Fractions >300 Mm From Unsegregated Municipal Waste, Waste After Segregation Of Raw Material Waste, As Well As Shredded Waste From The Dismantling Of Large-Sized Waste. The Composition Of Waste Constituting The Input Material For Components For The Production Of Alternative Fuel Consists Mainly Of Plastic Waste - Including: Ldpe, Pe, Pp, Pet, Ps And Paper, Cardboard, Rubber And Textile Waste. Waste With Code 19 12 12 Will Be Prepared By The Ordering Party For Collection In Bulk. Waste Used To Prepare Components For The Production Of Alternative Fuel Is Practically Free Of Ferrous Metals, Non-Ferrous Metals And Glass By Subjecting It To Magnetic, Eddy Current And Manual Separation Processes. Loading Of Waste Will Be The Responsibility Of The Ordering Party. Waste Collection Will Take Place From The Premises Of The Municipal Waste Disposal Plant In Puławy At Ul. Dęblińska 96 On Working Days, I.E. From Monday To Friday From 7.00 A.M. To 5.30 P.M., In The Quantity Specified In The Sales Order Sent By The Ordering Partys Representative By E-Mail To The Contractors Representative. Collection Will Take Place Within 2 Business Days From The Date Of Sending The Sales Order. Weighing Of Waste By The Ordering Party Will Take Place On A Verified Truck Scale, Located At The Ordering Partys Plant At Ul. Dęblińska 96 In Puławy. The Ordering Party (Waste Transferor) Will Prepare Waste Records Documents Via An Individual Account In The Database On Products, Packaging And Waste Management (Bdo), In Accordance With The Principles Set Out In The Provisions Of The Act Of December 14, 2012 On Waste (Consolidated Text: Journal Of Laws Of 2023, Item 1587, As Amended). Circulation Of The Above Documents Will Be Processed In The Manner Specified In These Regulations. 2. The Amount Of Waste That Will Be Transferred To The Contractor During The Term Of The Contract Will Be No More Than 7,800.0 Mg. The Quantity Indicated Above Is The Maximum Quantity, And The Order Will Be Implemented Successively During The Contract Period In Accordance With The Actual Needs Of The Ordering Party, Provided That The Ordering Party Guarantees To Provide The Contractor With Waste Code 19 12 12 In A Minimum Quantity Of 1,000.0 Mg During The Order Execution Period. 3. The Deadline For Completing The Order Is 12 Months From The Date Of Signing The Contract Or Until Waste In The Amount Of 7,800.0 Mg Is Collected, Provided That This Happens Before The Expiry Of
|