Ventilation Installation Work – Air Conditioning Systems. The Existing Broadcasting Museum In Fürth Will Be Renovated And Supplemented With A New Building. The Floor Slab, Ceilings And Load-Bearing Walls Are Made Of Concrete. The Remaining Interior Walls Are Made Of Drywall And Masonry. The Heating Center Is Located In The Basement. In This, The Ahu For This Floor Is Mounted On The Ceiling. The Ducting Takes Place On The Ceiling. The Sound Absorbers For The Recording Studio Must Meet The Specifications Of The Recording Studio Builder. The Fire Dampers Must Be Installed In Accordance With The Fire Protection Planning Specifications. From The Ground Floor To The 2Nd Floor, A Floor-Standing Air Conditioning Unit With An Electric Heating Register Is Installed On Each Floor. The Control Of The Air Conditioning Systems Should Come Together Centrally In The Heating Center. The Distribution To The Risers Takes Place On The Ceiling Of The Floors. The Entire Installation In The Building Is Drawn Above The Ceiling.
Contact Information
Address
Hirschenstraße 2
Contact No.
+49 911-974-3131
Email
vergabestelle@fuerth.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 107565156
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.