|
1. The Subject Of The Order Is The Implementation Of The Task Entitled: Establishment Of A Municipal Park&Ride Point In Mełgiew As Part Of The Project Development Of Infrastructure For Low-Emission Transport In The Mełgiew Commune. The Development Of The Area Includes A Parking Lot With 14 Parking Spaces, The Construction Of A Pedestrian And Bicycle Path, Bicycle Shelters With Stands, A Bicycle Repair Station, Benches, Including One Solar Bench With The Possibility Of Charging Mobile Devices, The Construction Of A Public Toilet, And Pedestrian Paths And Recreation Areas Along The Stawek-Stoki River. The Entire Area Is Planned For Lighting And Monitoring. The Land Development Project Also Includes Greenery, Including Planting Trees, Shrubs And Low Vegetation In Order To Improve The Microclimate, Reduce Noise And Increase Water Retention. The Task Also Includes The Construction Of Green Recreation Zones That Are Intended To Harmoniously Combine Infrastructure With Nature. There Is A Designated Parking Space For Disabled People In The Parking Lot. The External Installations Include An Internal Power Supply Line, Lighting And Area Monitoring, As Well As An External Sanitary Sewage System With A Septic Tank For Sewage. The Order In Question Also Includes The Construction Of Two Footbridges On The River: A Pedestrian And Bicycle Footbridge And A Pedestrian Footbridge On The Stawek-Stoki River. The Area Covered By The Study Is Currently An Undeveloped Green Area, Partially Paved With Aggregate, Located At Ul. Partisan In Mełgwia. In The Investment Area, In Accordance With The Greenery Industry Documentation, There Are Some Trees Intended For Felling By The Contractor (The Ordering Party Has The Necessary Permit To Remove Trees In This Respect). 2. The Task Includes Land Development In The Town Of Mełgiew, In Particular: 1) In The Road Industry: A) Removal Of A Layer Of Fertile Soil - Topsoil From The Plots Intended For The Construction Of Road Surfaces, B) Execution Of Earthworks - Excavations And Embankments, C) Installation Of Concrete Stops: Concrete Curbs, Concrete Edges, Stone Palisades At Raised Flowerbeds, D) Construction Of Surfaces: Internal Roads And Parking Lot Made Of Concrete Paving Stones, Thickness 8 Cm, Anthracite And Gray Colors (Segregation Lines In The Parking Lot), Sidewalks Made Of Phaseless Concrete Paving Stones, Thickness. 6 Cm Gray, Pedestrian And Bicycle Paths Made Of Phaseless Concrete Paving Stones, Thickness. 6 Cm, Anthracite Color, E) Execution Of Vertical And Horizontal Road Signs And Traffic Safety Devices; 2) In The Architectural And Construction Industry: A) Delivery And Assembly Of Small Architecture Objects, Including 14 Pieces Of Park Benches, 8 Pieces Of Waste Bins With A Steel Structure, 20 Bicycle Racks, B) Delivery And Assembly Of 4 Pieces Of Roofed Bicycle Shelters With A Steel Structure, C) Delivery And Assembly Of 1 Piece. Solar Bench, D) Delivery And Assembly Of 1 Bicycle Repair Station, E) Delivery And Assem
|