|
Construction Of Torowa Street In Sopot The Subject Of The Order Is: Execution Of Construction Works Consisting In The Construction Of A Street On A Section Of Approx. 450 M, Construction Of A Roundabout Within The Intersection Of Ul. Torowa And Ul. Jana Z Kolno And The Construction Of An Integration Junction With Parking Spaces. The Subject Of The Order Includes: - Construction Of A Road On A Section Of Approximately 450 Meters, (Demolition Works, Construction Of A New Bituminous Road Surface - Binding Layer, Sma Wearing Course), - Construction Of Pedestrian Paths Along The Road On Both Sides With Concrete Tiles, - Construction Of Parking Spaces And Exits From Concrete Blocks, Construction Of 6 Pedestrian Crossings, Including Elevated Crossings, - Construction Of An Integration Junction With An Area Of Approx. 8,000 M2 With Parking Spaces - 81 Parking Spaces, - Construction Of A Bus Bay Made Of Split Stone Cubes With 4 Parking Spaces, - Construction Of A Mini Roundabout With Three Entrances At The Junction Of Ul. Torowa And Ul. Jan From Kolno, - Construction Of A Storm Sewage Network With Channel Diameters From Dn200mm To 1000Mm, Inspection Wells Made Of Concrete Rings Dn 1200Mm And Sewage, -Construction Of A Sanitary Sewage System Ø160 - Ø200mm With Inspection Wells, -Construction Of A Rainwater Sewage Chamber, -Construction Of A Retention Basin With An Area Of 288 M2, - For The Purpose Of Rainwater Retention - Installation Of A Retention Pipe Tank, - Installation Of Gas Pipelines With A Diameter Of Ø63 Mm - Ø225 Mm, - Dismantling Of The Existing Lighting Along With The Disassembly Of The Existing Cable Lines Supplying The Lighting, - Construction Of A Road Lighting Network With The Construction Of Lighting For Pedestrian Crossings, (Construction Of A Lighting Cable Line, Installation Of Poles And Street Lighting Fixtures) - 46 Pcs. Incl. Installation Of A Lighting Cabinet, - Construction Of A Technological Duct With A Diameter Of 1000 Mm And A Length Of Approx. 58 M, - Installation Of Small Architecture Elements (Benches, Partition Posts, Waste Bins, Bicycle Racks, Bicycle Shelter), - Reconstruction Of Existing Infrastructure - Removal Of Energy, Telecommunications, Sanitary, Gas And Water Supply Collisions, - Construction Of Balustrades Along The Sidewalk Steel, - Planting High Greenery With A 3-Year Maintenance Period - Approx. 30 Trees, - Implementation Of Traffic Management Elements - Horizontal Marking, - Construction And Installation Of One Information Board In The Place Indicated By The Ordering Party During The Construction.
|