|
Prior Information Notice For Construction Work - Sewage Network Construction Works Involving The Construction, Reconstruction, Expansion, Renovation Of The Sewage Network And Buildings And Technological Structures Related To It. Erection Of A New Fence At The Karłowice Sewage Pumping Station At Ul. Kasprowicza 33 In Wrocław..,Renovation Of The Ceiling Slab Of The Collecting Well Of The Port Północny Pumping Station,Construction Of A Barrier In Front Of The Internal Road To The Catchment And Sewage Pumping Station Dobra Ul. Early Spring,Renovation Of The Mv/Lv Switchboard Of The Port Północ Pumping Station,Construction Of A Water Supply Network And Sanitary Sewage System At The Junction Of Złota Lilli And Czerwonej Róży Streets In Kłokoczyce,Construction Of A Dephosphatation Building With The Necessary Infrastructure On The Premises Of Woś,Reconstruction Of The Pressure Pipeline From The Pumping Station On Słodowa Island.,Construction Of The Indens Technical Installation In The Woś Area.,Reconstruction Of The Mv Supply Line From Rg1 To Rg2 And Rg1 To Rg3 And Reconstruction Of The Syndis-Rv Energy Visualization System And I&C Works In The Areas Of The R7, R3 And R3.1 Switchboards.,Renovation Of The Flood Gate In The Chamber On The Premises Of The Port Północ Pś At Ul. Kleczkowska.,Reconstruction Of The Water Supply Network And Construction Of A Sanitary Sewage System In Ul. Strachowicka.,Removing Failures In The Sewage Network.,Construction Of A Sanitary Sewage System In Ul. French.,Construction Of A Water Supply Network And Sanitary Sewage System In Ul. Marszowicka.,Renovations Of Roads And Squares At Woś.,Renovation Of Woś Lighting.,Modernization Of The Ventilation Installation Of The Polanka Sewage Pumping Station.,Performance Of Works Related To The Replacement Of The Switchgear At The Szczytniki Sewage Pumping Station.,Performance Of Construction Works Regarding The Renovation Of The Collector At Ul. Rainbow.,Construction Of Sanitary Sewage System Marszowice Iii - Ul. Krzelowska And Łososiowicka.,Construction Of A Module For Preparing Bio-Waste For The Co-Fermentation Process In The Wkf At Woś As Part Of The Pfu.,Construction Of A Pressure Water Installation At Wkf At Woś.,Modernization Of The Flocculant Digestion Installation For Thickening Woś Sludge.,Modernization Of The Installation Of The Flocculant Digestion Plant For Woś Sludge Dewatering.,Performance Of Construction Works Consisting In Relieving The Storm Overflow At Warsaw Bridges.,Performance Of Works For Renovation Of The Brochów Ii And Kowale Iii Sewage Pumping Stations.,Performance Of Construction Works Based On Doc. Project Regarding The Automation Of The Operation Of The K6 Digested Sludge Pumping Station At Woś.,New Lime Silo With Dosing Devices At Woś.,Renovation Of The J4/4 Thickener Coating.,Renovation Of Linings In Wkf K3/3 - K3/6 Overflow Chambers.,Renovation Of The Installation Within The Wkf At Woś.,Renovation Of Drainage At The Exchanger And Pump Building. Recirculation K1/2 At Woś.,Renovation Of Seals Of Wells And Chambers In The Woś Area.,Renovation Of The Woś Fence From The Side Of The Composting Plant.,Liquidation Of Technical Infrastructure On The Osobowice Irrigated Fields.,Renovation Of The Lightning Protection Installation At Woś.,Renovation Of The Drainage Of The U1 Boiler Room At Woś.,Renovation Of Steel Bathtub Structures. Under Scrubbers With Technical Water In The Building M3 At Woś.,Execution Of Construction Works Involving The Expansion Of Woś - Stage Iv.,Performance Of Construction Works Related To The Construction Of A Sanitary Sewage System For The Wrocław Sports Cente
|