Sanitary Fixture Installation Work – Sanitary Fixtures. Hot Water Is Prepared Centrally Via A Water Heater. The Cold And Hot Water Pipes Are Laid On The Ground Floor Under The Ceiling And In The Pre-Wall Installations. The Line System Is Designed As A Looped Network. There Is No Separate Distribution On The Upper Floor. The Connection To The Upper Floor Is Made From The Ground Floor Via Risers In The Suspended Ceiling, Runs There In The Pre-Walls Of The Upper Floor And Then Leads Back Down Into The Suspended Ceiling On The Ground Floor. An Automatic Flushing Station Is Provided At The End Of The Cold Water Pipe. All Fittings Are Designed As Electronic Flushing Fittings With A 230 V Permanent Connection. The Entire Drinking Water Network Is Installed In A Stainless Steel Pipe System With Stainless Steel Press Connections. The Connection To An Existing On-Site Handle Pump In The Outdoor Area Is Made Via A Type Ba System Separator. The Connection Is Made Using Buried Pex Pipe. For Further Details, Please Refer To The Tender Documents.
Contact Information
Address
Lutherstraße 14
Contact No.
+49621727397-0
Email
hauser@cshulze-hagen.com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 107472494
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.