1. The Subject Of The Order Is Implemented As Part Of The Project Entitled Kindergarten As A Place Of Inclusive Education, Co-Financed Under Measure 7.5 Educational Infrastructure Under Integrated Territorial Investments (Project Type 1, 2, 3, 4, 5, 6) Of Priority Vii Better Access To Social And Health Services Of The European Funds For Lublin 2021-2027 Program.2. Subject Of Part No. 1 Of The Order Entitled Reconstruction Of The Gymnasium Includes In Particular: 1) Adding An External Elevator, 2) Rebuilding The Water Supply Connection Colliding With The Elevator, 3) Adding An Internal Stair Platform, 4) Dismantling The Parquet Floor And Flooring With All Layers And Restoring All Layers, 5) Restoring Internal Plasters On Walls And Ceilings, 6) Separating The Gymnasium From The School Staircase With Fire-Rated Doors Internal,7) Adaptation Of Rooms For New Functions: Locker Room, Toilets, Technical Room, Physical Rehabilitation And Sensory Integration Room,8) Disassembly Of The Existing Electrical Installation,9) Power Supply Of The Planned Electrical Installation Of The Gymnasium (And Adjacent Rooms) From The Existing Electrical Panel,10) Installation Of A Certified Fire Protection Power Switch (Including Activation And Signaling Buttons), 11) Installation Of An Electrical Switchboard For The Gymnasium And Adjacent Rooms, 12) Installation Of Electrical Installation In The Gymnasium And In Adjacent Rooms, 13) Installation Of Monitoring And Alarm System In The Gymnasium And In Adjacent Rooms, 14) Installation Of A Call System In The Toilet For People With Disabilities, 15) Installation Of Lighting, Sockets And Power Supplies For Devices In The Rehabilitation Room, 16) Implementation Of Monitoring In The Rehabilitation Room, 17) Installation Of Sound System In The Room Gymnasium,18) Installation Of Mechanical Ventilation,19) Disassembly Of The Existing Central Heating Installation,20) Installation Of An Internal Central Heating Installation,21) Disassembly Of The Existing Internal Water Supply And Sanitary Sewage Installations,22) Installation Of An Internal Water Supply And Sanitary Sewage System,23) Replacement Of Existing Internal Hydrants,24) Installation Of Vertical Insulation Of The External Walls Of The Building,25) Performance Of Thermal Modernization Works, Including Insulation Of External Foundation Walls, Insulation Of Walls External, Flat Roof Over Social And Utility Rooms, Replacement Of Window And Door Joinery (External And Internal),26) Rebuilding The Wall Next To The Building,27) Replacing The Lightning Protection Installation,28) Insulating And Covering The External Stairs,29) Constructing A New Roof Over The External Stairs,30) Installing A Rainwater Drainage System,31) Replacing The Entrance Gate To The School Yard (A Double-Leaf Gate In A Uniform Set With Gate).
|