|
Full Site Civil Engineer With Additional Charges, General Manager With Additional Charges, Supply And Installation Of Site Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Siding With Metallic Tile. Af_03/2024, Temporary Light, Power, Telephone And Logic Installations, 01/14/2026 - 11:29:56, 01/14/2026 - 11:29:57, 01/14/2026 - 11:29:58, Temporary Water And Toilet Connection, Execution Of Toilet And Changing Room In Construction Site Made Of Plywood Sheet, Furniture Not Included. Af_02/2016, Execution Of Office On Construction Site Made Of Plywood Sheet, Furniture And Equipment Not Included. Af_02/2016, Execution Of Deposit On Construction Site Using Plywood Sheet, Furniture Not Included. Af_04/2016, Work Location - Execution Of Template, Mechanized Cleaning Of Plant Layer, Vegetation And Small Trees (Trunk Diameter Less Than 0.20 M), Using A Tracked Tractor. Af_03/2024, Horizontal Excavation, Including Loading And Unloading In 1St Category Soil With Crawler Tractor (100Hp/Blade: 2, 19M3). Af_07/2020, Loading, Maneuvering And Unloading Soil And Granular Materials In A 10 M³ Dump Truck - Loading With Hydraulic Excavator (1.20 M³ / 155 Hp Bucket) And Free Unloading (Unit: M3). Af_07/2020, Transport With 10 M³ Dump Truck, On Paved Urban Road, Dmt Up To 30 Km (Unit: M3xkm). Af_07/2020, Spreading Material With Crawler Tractor. Af_09/2024, Execution And Compaction Of Final Landfill Layer (100% Normal Proctor Energy) With Predominantly Sandy Soil, In Layers 20 Cm Thick - Exclusive Of Excavation, Loading And Transport And Soil. Af_09/2024, Manual Embankment Of Trenches With Clay-Sandy Soil. Af_08/2023, Manual Trench Excavation. Af_09/2024, Preparation Of The Bottom Of A Trench With A Width Greater Than Or Equal To 1.5 M And Less Than 2.5 M (Natural Soil Adjustment). Af_08/2020, Manual Trench Backfilling, With Percussion Soil Compactor. Af_08/2023, Manual Embankment Of Trenches With Sand For Landfill. Af_08/2023, Sand For Landfill - Deposit/Supplier Station (Collected At The Deposit, Without Transport), Slim Concrete Ballast, Applied To Crowning Blocks Or Footings, Thickness Of 5 Cm. Af_01/2024, Manufacture, Assembly And Disassembly Of Shoe Formwork, In Sawn Wood, E25 Mm, 4 Uses. Af_01/2024, Framing Of Miscellaneous Reinforced Concrete Structures, Except Beams, Pillars, Slabs And Foundations, Using 6.3 Mm Ca-50 Steel - Assembly. Af_06/2022, Using 10.0 Mm Ca-50 Steel - Assembly. Af_06/2022, Using Ca-60 5 Steel, Shoe Concreting, Fck 30 Mpa, Using A Pump - Launching, Densifying And Finishing. Af_01/2024, Applied To Floors, Slabs On Ground Or Radiers, Lean Concrete For Ballast, Mixture 1:4, 5:4, 5 (In Dry Mass Of Cement/Medium Sand/Gravel 1) - Mechanical Preparation With 600 L Concrete Mixer. Af_05/2021, Assembly And Disassembly Of Formwork For Baldrame Beam, Using Steel Ca-50 Of 8, Concreting Of Crowning Block Or Baldrame Beam, Assembly And Disassembly Of Formwork For Rectangular Pillars And Similar Structures, Simple Right Foot, Made Of Resin Plywood Sheet, 4 Uses. Af_09/2020, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 10 Ca-50 Steel, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 12.5 Mm Ca-50 Steel - Assembly. Af_06/2022, Concreting Of Pillars, Fck 25 Mpa, Using Buckets - Laying, Densifying And Finishing. Af_02/2022, Assembly
|