1. The Subject Of The Contract Is The Improvement Of Water And Sewage Management In The Leśnica Commune - Extension Of The Water Supply Network Within The Area Of Ul. Wiejska In Poręba.2. Scope Of The Order The Task Involves The Construction Of A New Water Distribution Network In The Area Of Residential Development At Wiejska Street In The Town Of Poręba, Connecting The Existing Branches Of The Water Supply Network.3. The Total Material Scope Includes The Following: 1) Eligible Costs: - Distribution Network Pipeline Made Of Ø110x6.6Mm Pe100rc Sdr17 Pn10 Pipes, 624.0 M Long, - Hydrant Connection Pipeline Made Of Ø90x5.4Mm Pe100 Sdr17 Pn10 Pipes, 11.5 M Long, - Installation Of Above-Ground Dn80 Hydrants With Shut-Off Gate Valve - 5 Sets, - Installation Of Dn100 Type E Flanged Wedge Gate Valves With Casing And Street Box - 4 Sets, 2) Ineligible Costs: - Drilling For Pipes Dz110mm With Gate Valve, Casing And Street Box - 8 Sets, - Connection Pipeline Made Of Pe100 Sdr17 Pn10 Pipes With A Diameter Ø32x2.0Mm, 110.0 M Long. Sections Of The W-1 Water Supply Network In The Area Of The District Road No. 1468 O (Ul. Wiejska), In The Area Of Plots No. 179 And 293, And At The Intersections Of The Transverse Connections With The Road Of The District Road, Will Be Made Without Trenches Without Disturbing The Road Surface Or Entrances By Means Of Drilling, With The Drilling Chambers Located Outside The Road Of The District Road Or Entrances, With The Exception Of Places Of Connection With The Existing Network Or Connections And The Planned Location Of Water Supply Nodes Or Tees And Drills. In Addition, The Section Of The W-1.1 Water Supply Network From The Wz2 Water Supply Node To The Wz3 Node Will Be Made Using Open, Reinforced Excavations Due To The Need To Identify The Places Of Connecting Existing Connections To The Existing Water Supply Network.4. The Full Scope And Description Of The Subject Of The Order Is Determined By: - Construction Design, Technical Design, - Technical Specification For The Execution And Acceptance Of Works, - In Addition, The Bill Of Quantities, - On-Site Visit Provided By The Ordering Party.5. Note! The Contractor Will Also Include In The General Costs: Surveying Services, Post-Construction Surveying Inventory, Together With The Electronic Version Of Cegeo, Traffic Management Project, Occupation Of The Road And Related Costs, Organization, Development And Liquidation Of The Construction Site, Preparation Of A Safety And Health Protection Plan, If Separate Regulations Require The Preparation Of Such A Plan, Organization And Marking Construction, Ensuring Access To Other Facilities On The Property For The Duration Of The Works, Renovation And Repair Of Damage Caused In The Road, Tests And Acceptance With The Participation Of The Required State Institutions, The Investor And The User, Collecting Waste Resulting From The Implementation Of The Subject Of The Order And Transferring It For Recovery, Disposal Or Storage (Includi
|