1. The Subject Of The Order Is The Execution Of Works Consisting In Panel Construction And Finishing Of Newly Built Rooms Intended For The Operating Block. The Subject Of The Order Includes The Following Rooms: Operating Room, Recovery Room, Doctors Preparation Room And Patients Preparation Room.2. The Description Of The Works Is Included In The Annexes To The Specification: - No. 1: Description Of The Subject Of The Order, - No. 2: Floor Plan Of The Rooms, - No. 3: List Of Technical Parameters.3. The Order Also Includes The Delivery And Assembly Of Medical Equipment Such As: Furniture, Telescopic Booms (2 Pcs.), Anesthesiology Bridge, Two-Station Hanging Surgical Wash Station, Wall-Mounted Slatted Shelf, Double-Dish Operating Lamp, Anesthesia Column, Modular Surgical Cabinet (3 Pcs.), Clock. 4. The Order Is Co-Financed By The National Reconstruction And Resilience Plan, Investment D1.1.1 Development And Modernization Of The Infrastructure Of Highly Specialized Care Centers And Other Medical Entities, As Part Of The Project Entitled Modernization, Expansion And Additional Equipment Of The Średzki Sacred Heart Of Jesus Hospital In Order To Improve The Quality, Availability, Comprehensiveness And Effectiveness Of Oncological Diagnostics And Treatment In The Średzki Poviat (Project No.: Kpod.07.02-Ip.10-0246, Support Agreement No. Kpod.07.02-Ip.10-0246/24/Kpo/592/2025/155).5. The Warranty Period For Defects And Warranty Is Set At 60 Months, Counted From The Date Of The Protocol Acceptance Of The Works. 6. The Contractor Is Obliged To Have A Paid Insurance Policy Throughout The Duration Of The Contract, And In The Absence Thereof, Another Document Confirming Civil Liability Insurance (Oc) In The Scope Of The Business Related To The Subject Of The Contract With A Guarantee Sum Not Lower Than: Pln 1,000,000.00 (One Million Zlotys). Civil Liability Insurance Should Cover Civil, Tort And Contractual Liability For Personal And Property Damage And Their Consequences. Before Signing The Contract, The Ordering Party Will Require A Policy Or Other Document Confirming Insurance (Copy, Original For Inspection).7. Construction Products Used To Implement The Subject Of The Order Must Be Marked With The Ce Mark, Have Appropriate Certificates, Be Free From Defects And Defects, Be Admitted For Trading And General Or Individual Use In Construction, Meet The Quality Requirements Specified In The Construction Products Act.8. The Contractor Selected To Complete The Order Is Obliged To Submit A Simplified Offer Cost Estimate To The Ordering Party Before Concluding The Contract.9. When Executing The Order, The Contractor Is Obliged To Apply The Dnsh Principle (Principle Of Not Causing Significant Damage To The Environment) And To Comply With The Requirements Related To Environmental Protection. The Contractor Is Obliged, In Particular, To: - Provide Waste Generated Cards To Authorized Entities And Each Time To The Ordering Party, - To Provide The Ordering Party With Evide
|