|
Basic Project (Board A1)Studies, Project And Reports, Basic Project (Board A1)Project, Executive Project (Board A1)Project, Executive Project (Board A1)Studies, Technical Reportstudies, 01/13/2026 - 09:27:59, 01/13/2026 - 09:28:00, Pavement Sizing Studies, Plan Project For Paving Public Roads With One Lanestudies, Project In Profile For Paving Public Roads With One Lanestudies, Hydraulic Project For Rainwater Gallery In Tubosestudies, Hydrological Study Of Non-Ruined Areastudies, Planialtimetric Survey Topographical Cadastre Survey, Manual Auger Surveysounding, Mobilization And Installation Of 1 Equipmentpercussion Surveying, Moving Equipment Between Holes In Flat Ground, Considering A Distance Of Up To 100Mpercussion Surveying, Considering A Distance Of Up To 100Mrotary Surveying, Drilling And Execution Of Penetometric Or Time Washing Testspercussion Surveying, Mobilization And Installation Of 1 Equipment, Considering A Distance Of Up To 10Kmsurveying Rotary, Drilling In Soils Or Decomposed Rocks Laboratory, Laboratory Tests - Granulometry With Sedimentationlaboratory Tests, Development Of Technical Drawing Board/ Detailing Format A1project, Planialtimetric Survey Of Areas - Exceeding 10,000M2topographic Survey, Manual Augerprobing, Mobilization And Installation Of 1 Equipment To Execute Percussion Surveypercussion Survey, Considering The Distance To 100M, For Percussion Surveypercussion Survey, Cadastral Survey Of Buildings Up To 500M Functional Orientation - 201 To 500 M, Routine Inspection With Functional Guidance - Above 500 M, Special Inspection - 0 To 100 M, Special Inspection - 101 To 200 M, Special Inspection - 201 To 500 M, Special Inspection - Above 500 M, Equip.Vis.Oae C/Lanc.Artic.12, 14M Cond.D, Planialtimetric Survey Of Areas - Up To 10,000M2topographic Survey, Technical Opinion On Foundation For Built-Up Area Up To 2000M2technical Opinion, Technical Opinion On Foundation For Built-Up Area From 2001 To 5000M2technical Opinion, Technical Opinion On Foundation For Built-Up Area From 5001 To 10000M2technical Opinion, Development Of A Technical Fire Prevention And Fighting Project And Approval With The Fire Department For Buildings Up To 2000 M2technical Fire Prevention And Fighting Project, Development Of A Technical Fire Prevention And Fighting Project And Approval With The Fire Department For Buildings From 2001 M2 To 5000 M2project Fire Prevention And Fighting Technician, Development Of A Fire Prevention And Fighting Technical Project And Approval With The Fire Department For Buildings From 5001 M2 To 10000 M2fire Prevention And Fighting Technical Project, Professional Technical Services To Obtain The Avcb With The Fire Department
|