|
Part 1 Of The Order - Thermal Modernization Of The Zsp Building In Mierzyce. The Subject Of The Order Is The Design, Obtaining All Decisions, And Then Execution Of Construction Works And As-Built Documentation For The Task In Question. The Scope Of Construction Works Includes Thermal Modernization Of The Building Consisting Of: - Disassembly And Demolition Works, Including The Demolition Of Stairs On The Ground, Construction Of A Ramp For The Disabled (At The Side Entrance), Sidewalks And Architraves, Disassembly Of Small Elements From The Facade, Dismantling Of Windows And Doors Intended For Replacement With New Ones, Disassembly Of Window Grates, Chimneys And Ventilation Ducts Running On The Facades, And Then Construction Of External Stairs, Construction Of A Ramp For The Disabled, Construction Of A Architrave Around Building And Sidewalks. - Insulating The External Walls Of The Old Part Of The School, - Insulating The Foundation Walls To A Depth Of Min. 1 M Below The Ground Level, - Insulating The External Walls Of The Former Junior High School And Gymnasium, - Insulating The Foundation Walls To A Depth Of Min. 1 M Below The Ground Level, - Insulation Of The Ceiling Under The Unheated Attic Of The Old Part Of The School, - Insulation Of The Ceiling Under The Unheated Attic Of The Former Junior High School, - Insulation Of The Ceiling Under The Unheated Attic Of The Gymnasium, - Replacement Of Windows, - Replacement Of External Doors, - Renovation Of Reinforced Concrete Roofs Over The Entrances, Sheet Metal Work, Construction Of Gutters And Downspouts, - Replacement And Installation Window Joinery, - Replacement And Installation Of Door Joinery. Scope Of Electrical Works: - Reconstruction Of The Electricity Connection, - Replacement Of The Earthing Installation, - Installation Of A Photovoltaic Installation, - Replacement Of The Lightning Protection Installation, - Covering Sanitary Facilities, - Replacement Of External Lighting On The Facade. Scope Of Internal Sanitary Works: - Installation Of A Pellet Boiler Room, - Installation Of A Fuel - Pellet Storage Facility, - Installation Of A Heat Pump, - Comprehensive Replacement Of The Central Heating Installation. The Contractor Is Obliged To Carrying Out Construction Works In A Way That Ensures Uninterrupted Functioning Of The Educational Unit. The Subject Of The Order Is The Design And Implementation Of Thermal Modernization Of The Building, Including: 1) Development Of Design Documentation In Accordance With The Functional And Utility Program - Hereinafter Referred To As Pfu (Annex No. Form Of The Construction Design And In Accordance With The Regulation Of The Minister Of Development And Technology Of December 20, 2021 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Functional And Utility Program - In Paper Form (5 Copies) And In Electronic Form On Cd/Dvd (2 Copies); B) Executive Designs For The Ent
|