The Subject Of The Order Is The Construction Of A Section Of Sanitary Sewage System In The Town Of Lutcza, Niebylec Commune - Catchment Area Of The P1 Pumping Station. The Scope Of Works Includes The Construction Of A Sanitary Sewage System With A Total Length Of 2,388.50 M, Including In Particular: A) Gravity Sanitary Sewage System, Including: I) Gravity Sanitary Sewage System - Section P1-A1-A61a: 1) Preparatory Works, 2) Earthworks, 3) Assembly Works (Including Channels Made Of Solid Pvc-U Pipes Sn12; Sdr34 With A Diameter Of 160X5.2 Mm - 409.0 M, Channels Made Of Solid Pvc-U Pipes Sn12; Sdr34 With A Diameter Of 200X6.5 Mm - 751.0 M), 4) Drainage Of Excavations, 5) Securing The Sewage System At The Intersection With Gas Network (Protective Pipe), 6) Protection Of Telecommunications Cables At The Intersection With The Sanitary Sewage System, 7) Protective Pipes Where The Sanitary Sewage System Is Close To Existing Water Intakes, 8) Drillings Under The District Road (Including Drilling Guided By The Pe100-Rc; Sdr17 Double-Layer Protective Pipe With A Diameter Of 315X18.7 Mm - 73.0 M), 9) Drillings Under Municipal Road (Including Drilling Guided By A Pe100-Rc; Sdr17 Double-Layer Protective Pipe With A Diameter Of 225X13.4 Mm - 33.0 M), Ii) Gravity Sanitary Sewage System - Section A1-A2-102; A2-110: 1) Preparatory Works, 2) Earthworks, 3) Assembly Works (Including Channels Made Of Solid Pvc-U Pipes Sn12; Sdr34 With A Diameter Of 160X5.2 Mm - 235.0 M, Channels Made Of Solid Pvc-U Pipes Sn12; Sdr34 With A Diameter Of 200X6.5 Mm - 634.0 M), 4) Drainage Excavations, 5) Securing The Sewage System At The Intersection With The Gas Network, 6) Protective Pipes At The Point Where The Sanitary Sewage System Is Close To Existing Water Intakes, 7) Drilling Under The District Road (Including A Drill Guided By A Pe100-Rc; Sdr17 Double-Layer Protective Pipe With A Diameter Of 315X18.7 Mm - 35.0 M), 8) Drilling Under A Municipal Road (Including A Guided Drill Pe100-Rc Protective Pipe; Sdr17 Double-Layer With A Diameter Of 315X18.7 Mm - 58.0 M, Drilling Guided By The Pe100-Rc Protective Pipe; Sdr17 Double-Layer With A Diameter Of 225X13.4 Mm - 9.0 M), B) Sanitary Pressure Sewage, Including: 1) Preparatory Works, 2) Earthworks, 3) Drainage Excavation, 4) Assembly Works (Including Pipelines Made Of Pe100; Sdr17; Pn10 Polyethylene Pipes With A Diameter Of 90X5.4 Mm - 109.0 M, Channels Made Of Solid Pvc-U Pipes Sn12; Sdr34 With A Diameter Of 200X6.5 Mm - 9.5 M), 5) Protection Of Telecommunications And Electric Cables At Intersections With The Pressure Pipeline, 6) Directional Drilling Under The Stobnica St2 Stream (Including Directional Drilling With A Double-Layer Pe100-Rc Sdr17 Service Pipe With A Diameter Of 90X5.4 Mm - 33.0 M), 7) P1 Sewage Pumping Station (Including Delivery And Installation Of A Complete P1 Sewage Pumping Station, Internal Diameter 2000 Mm, Total Depth 8.39 M), 8) Pumping Station Fencing, 9) Hardening The Pumping Station Area With Paving Stones,
|