|
Construction Work – Mpi For Astronomy: Extension Of The Institute Building: Drywall Construction. Mpi For Astronomy: Drywall Work: Drywall Work As Metal Stud Walls As Drywall Walls, Sliding Connections And Ceiling Work With Acoustic Absorbers And Baffles As Well As Metal Cassette Ceilings, Metal Stud Walls With Double Gk Cladding, F0-F90, D 100-200 Mm: Approx. 1,350 M2 Facing Shells, Shafts With Double Gk Cladding And Cement Construction Panels: Approx. 200 M2 Creating Door Openings Including Reinforced Uk Ua Profile, Wall Thickness D 150 Mm: Approx. 100 Pieces Reinforcing Door Openings And Wall Reinforcements With Hollow Steel Profile 50/50/4 Mm: Approx. 20 Pieces T-Connections, Free Wall Ends, Outside Corners With Corner Protection Rails: Approx. 300 Running Meters Ceiling Absorber, Glued As A Wood Wool Lightweight Building Board With Mineral Wool D 25+95 Mm: 320 M2..D25+40 Mm: 100 M2 Ceiling Baffles, Slat System, Suspended Vertically, As Acoustic Panels With Glass Wool Core, D 40 Mm, L1.80M Approx. 185 Pieces, D 40 Mml 0.90 Approx. 160 Pieces Gk Smooth, About Kitchen Counter, Including 8 Inspection Openings: 60 M2. Ceiling Offset With H 45 Cm: L. Approx. 20 M Metal Cassettes, Square 62.5Cm X 62.5 Cm, Clamping System, Suspended, Steel, Powder-Coated: 110 M2 Metal Cassettes, Long Field With Band Grid, In The Kitchen Area, Suspended, Aluminum, Powder-Coated: 55 M2 Execution Must Begin: Within 12 Working Days Of Receipt Of The Request From The Client (§5 Para. 2 Sentence 2 Vob/B); The Request Will Come To You In Advance. To Be Received By April 13, 2026. The Service Must Be Completed (Ready For Acceptance): Within 110 Working Days Of The Deadline Specified Above For The Start Of Execution. (5 Working Days/Week) Special Note Regarding Bidder Questions Due To Special External Events (E.G. Sars-Cov-2 Or Ukraine War): When Preparing Your Offer, Please Take Into Account Any Possible Or Recognizable Impairments, E.G. With Regard To The Availability Of Materials And Products, Workers, A Possible Delay In Providing The Required Evidence, Effects On Any Subcontractors, Etc. We Ask That You Inform Us Of Any Questions That Arise In This Context In Good Time Before The Offer Deadline Eprocurement Messaging System.
|