4.1. The Subject Of The Order Are Construction Works As Part Of An Investment Task Including The Renovation Of The Suw Technology Along With Renovation Works On Facilities That Will Be Necessary For The Proper Functioning Of The Suw.4.2. The Subject Of The Order Includes In Particular: A) In The Scope Of Design Works: - Obtaining Current Extracts From The Land Register For The Areas Covered By The Agreement, - Carrying Out The Necessary Inventories And Local Visits, - Preparation Of The Concept Of The Subject Of The Order With Verification Of Design Assumptions, Utility Balance And Description Of Design Solutions Along With Obtaining The Approval Of The Ordering Party, - Agreeing On The Collision Of The Designed Facilities With The Managers Of The Existing Infrastructure Located In The Study Area - Developing A Map For Design Purposes, - Reporting The Passage Of Pipelines Under Water In Accordance With Requirements Of The Act Of 18 July 2001 Water Law (As Amended), - Obtaining Other Arrangements, Opinions And Administrative Decisions Required By Law, - Obtaining Technical Conditions, Arrangements With The Owners Of Plots Covered By The Impact Area And The Necessary Opinions And Administrative Decisions, - Obtaining The Public Purpose Investment Location Decision - Developing A Construction Design To The Extent Consistent With The Requirements Of The Construction Law Act Of July 7, 1994 (Consolidated Text: Journal Of Laws 2021, Item 2351), - Developing A Development Design Area, Architectural And Construction Design (If It Is Necessary To Obtain A Notification Or Building Permit, E.G. Related To The Separation Of Chlorination Room Rooms, Construction Of A Storage Tank), Technical Design And Executive Design For All Industries, - Preparation Of Bills Of Quantities, Cost Estimates, Technical Specifications For The Execution And Acceptance Of Works, - Preparation Of As-Built Documentation, B) Execution Based On The Prepared Documentation: 1. Construction Renovation Of The Main Hall Of The Suw, I.E. Min. :• Construction Of Foundations For Devices, • Construction Of Floors Made Of Technical Stoneware Or Epoxy Resin, • Execution Of Wall Cladding With Technical Stoneware, • Replenishment Of Plasters And Painting Of Walls, • Installation Of Lighting • Implementation Of Assisted Ventilation, • Replacement Of Windows And Doors Throughout The Facility, • Insulation Of The Building And Foundations, • Insulation And Replacement Of Roof Covering, • Execution Of Sheet Metal Work, Gutters And Downspouts, • Enlargement Of The Ramp In Front Of The Entrance To The Building. Dimensions Required By Regulations (Possibly New Ones)• Renovation Of Social Rooms And Sanitary Facilities2. Construction Of A Fully Automatic Water Treatment Technology For New Wwtp Parameters,3. Construction Of A Water Storage Tank With A Capacity Of 50M3.4. Separating The Chlorination Room With An Entrance From The Outside, 5. Equipping The Facility With A Permanent Power Generator,6. Necessar
|