|
Ventilation Installation Work – Blb Nrw Cologne / University Of Bonn, Academic Art Museum Repair, Ventilation Systems, Ventilation Work. Akm Repair Trade Rlt, Ve 430 Rlt System 02, 5,800 M3/H, Installation Location: U1.007 Rlt System 03, 3,500 M3/H, Installation Location: Lecture Hall 0.024 Rlt System 04, 4 X 250 M3/H, Installation Location: U1.F05 & U1.F08 Rlt System 04, Room Control Unit And Room Sensor Exhaust Air System 07, Radial Ec Duct Fan, Installation In The Air Duct 600X300mm, Installation Location: U1.028 Exhaust Air System 08, Ec Radial Fan, Dn 200, Installation Location: U1.028 Control System, Electronic Automatic Control With 0-10 V Dc Control Output Speed Potentiometer With Operating Display 10V Dc, Surface-Mounted Exhaust System 09, 2 X 60 M3/H, Installation Location: U1.039 & U1.001 Flush-Mounted Housing Exhaust System 09, 2 X 60 M3/H, Installation Location: U1.039 & U1.001 Exhaust Air System 10, Small Fan, Dn 100, Installation Location: U2.001 Humidity Differential Control, Installation Location: U2.001 Exhaust Air System 11, External Wall Exhaust Fan, Dn 150, Installation Location: U1.026 Air Outlets, Duct Installations, Other Fire Protection, Fire Protection Flaps Split Air Conditioning Systems And Distribution Network Air Shaft Renovation Existing Shafts Thermal Insulation Loading And Transport Sectional Installation Of Air Conditioning System 03 On The Ceiling Above The Lecture Hall - Metal Construction Leak Testing Of Air Ducts, Contact Test, Commissioning Of Each Air Conditioning System Before Trial Operation With Commissioning Manager, Construction Site Setup, Assembly Scaffolding, Profile Steel Construction, Hourly Wage Work
|