|
Removal Of Combined Playground, Osb Wood Sheet Siding. Af_03/2024, Supply And Installation Of Workplate With Galvanized Sheet And Wooden Structure., 07/01/2026 - 14:35:53, 07/01/2026 - 14:37:38, 07/01/2026 - 14:37:47, 07/01/2026 - 14:37:48, 07/01/2026 - 14:38:03, Conventional Location Of Work, Using Template Of Running Boards Pointed Every 1.50M - 2 Uses, Removal Of Metallic Structure And Water Tank, Rubble Bucket For Limestone, Location Of Container 2.30 X 6.00 M, Height 2.50 M, , Removal Of Interlocking Block Or Portuguese Stone Flooring, Manual Trench Excavation. Af_09/2024, Manufacture, Assembly And Disassembly Of Formwork For Footing, Insulated Footing Frame, Baldrame Beam And Running Footing, Concrete Fck = 25Mpa, Ratio 1:2, 3:2, 7 (In Dry Mass Of Cement/Medium Sand/Gravel 1), Thick Steel Sheet, Astm A36, E = 1/4 (6, 35 Mm) 49, 79 Kg/M2, Welder With Additional Charges, I Or W Profile In Laminated Steel, Any Dimensions, M16 French Screw In Galvanized Steel, Recomposition Of Flooring In Interlocked Floor, With Reuse Of Interlocked Blocks, For Closing Trenches, Wooden Mesh Composed Of Slats, Rafters And Purlins, Roofing With Wavy Fiber Cement Tile E = 6 Mm, White Acrylic Leveling Base Paint On Wood. Af_01/2021, Painting With Alkyd Finishing Paint (Satin Synthetic Enamel), Manual Trench Backfilling, With Vibrating Plate. Af_08/2023, Block Frame, Insulated Footing, Manufacture, Assembly And Dismantling Of Formwork For Baldrame Beam, 2:2, 5 (In Dry Cement Mass/Medium Sand/Rolled Pebble), Surface Waterproofing With Asphalt Blanket, Manufacture Of Formwork For Beams, In Resin Plywood Sheet, Pillar Or Beam Frame Conventional Structure, Manufacture Of Formwork For Columns And Similar Structures, Assembly And Dismantling Of Solid Slab Formwork, Concreting Of Beams And Slabs, Fck=25 Mpa, For Any, Masonry Sealing Ceramic Blocks Drilled Horizontally, Plaster Or Single Putty In 1:2:8 Mortar, Plaster Applied To Masonry (With The Presence Of Gaps), Ceramic Coating For Internal Walls With Type Plates, Ballast With Granular Material, Mechanical Compaction Of Soil For Execution Of Radier, Execution Of Industrial Reinforced Concrete Floor, Ceramic Coating For Floor With Porcelain Type Plates, Granite Threshold, Execution Of Flooring In Interlocked Floor, Laying Of Guide (Curb) In Straight Section, Ballast With Granular Material (Medium Sand), Lining In Pvc Rulers, Smooth, Finishes For Lining, Lining In Pine Wood, Wooden Weave Composed Of Purlins, Manufacture And Installation Of Half Scissors Made Of Unprepared Wood, Roofing With Thermoacoustic Metal Tile E = 30 Mm, With, Polycarbonate Sheet 6Mm In Fixed Panel Frame, Gutter In Steel Sheet Galvanized Number 24, Te, Pvc, Normal Series, Building Sewer, Dn 75 40 Mm, 45 Degree Elbow, Long Reduction Bushing, Inverted Reduction Junction, Small Grease Trap (Capacity: 19 L), Tilt (Inspection And Cleaning Tube) Condominium For Sewer, Siphon Box, Dn 100 Circular Septic, In Precast Concrete, Rectangular Drain, In Masonry With Solid Ceramic Bricks, Pvc Tube, Supplied, Series R, Rainwater, Tube
|