|
Lot 1 - Mobilization / Demobilization Of Equipment, Lot 1 - Work Sign (For Civil Construction) In Galvanized Sheet *N. 22*, Adhesive, *2.4 Additional Charges, 01/08/2026 - 14:45:29, Lot 1 - Surveyor With Additional Charges, Lot 1 - Surveyor Assistant With Additional Charges, Lot 1 - Occupational Safety Technician With Additional Charges, Lot 1 - Laboratory And Civil Construction Field Technician (Hourly), Lot 1 - Soil And Concrete Laboratory Assistant (Hourly), Lot 1 - Rental Of Container 2, 30 1 Urinal (Does Not Include Mobilization/Demobilization), Lot 1 - Orange Plastic Screen, Siding Type For Signage, Rectangular Mesh, Roll 1.20 X 50 M (L Chemical Bathroom, Round-Trip Transport, Maintenance And Sanitization 3X Week, Lot 1 - Recomposition Of Asphalt Concrete Coating, For Closing Trenches - Including Pavement Demolition, Lot 1 - Transport With 6 M³ Dump Truck, On Paved Urban Road, Dmt Up To 30 Km, Lot 1 - Execution Of Bonding Painting With Asphalt Emulsion Rr-2C, Lot 1 - Loading Asphalt Mixture In Dump Truck 10 M³ (Unit: T)., Lot 1 - Transport With Dump Truck Of 10 M³, Dmt Up To 30 Km (Unit: Txkm)., Lot 1 - Mechanized Excavation In Esg Ditch. Rainwater Soil 1St Cat. (Exclusive Transport), Lot 1 - Manual Excavation Of Trenches., Lot 1 - Spreading Of Material Using A Tracked Tractor. Af_11/2019, Lot 1 - Preparation Of The Bottom Of A Trench With A Width Of Less Than 1.5 M, With A Layer Of Gravel, Manual Launching, Lot 1 - Loading, Maneuvering And Unloading Of Soil And Granular Materials In A 10 M³ Dump Truck, Additional For Dmt In Excess Of 30 Km, Lot 1 - Execution Of Riprap, Lot 1 - Lean Concrete Cradle, Lot 1 - Lean Concrete Envelope, Lot 1 - Launching Using Buckets, Thickening And Finishing Concrete In Structures. Af_02/2022, Lot 1 - Mechanized Backfilling Of Trenches, Lot 1 - Gravel For Backfilling, Lot 1 - Sand For Backfilling, Lot 1 - Clay For Backfilling, Lot 1 - Supply Of 300Mm Pipe - Ps2 - Pb, Lot 1 - Supply Of 300Mm Pipe - Pa2 - Pb, Lot 1 - Settlement - 300Mm Pb Tubing, Lot 1 - Supply 400Mm Tubing - Ps2 - Pb, Lot 1 - Supply 400Mm Tubing - Pa2 - Pb, Lot 1 - Laying 400Mm Pb Tubing, Lot 1 - Supply 600Mm Tubing - Ps2 - Pb, Lot 1 - Supply 600Mm Tubing - Pa2 - Pb, Lot 1 - Pipe Laying 600Mm Pb, Lot 1 - Pipe Supply 800Mm - Pa2 - Pb, Lot 1 - Pipe Laying 800Mm Pb, Lot 1 - Pipe Supply 1000Mm - Pa2 - Pb, Lot 1 - Pipe Laying 1000Mm Pb, Lot 1 - Transport With Truck Body With Crane (Munck), Maximum Loading Moment 11.7Tm, Dmt Up To 30Km (Unit: Txkm). Af_07/2020, Lot 1 - Discontinuous Trench Shoring, Lot 1 - Continuous Trench Shoring, Lot 1 - Metallic Trench Shoring, Lot 1 - Manhole (Internal Measurement: 1.00Mx1.00M) Up To 1.45M Deep
|