|
Installation Services Of Electrical Equipment – 65 Fabian - Comprehensive Renovation Of The General Electrical Installations (Ieg) And Control Command (Cc) Of The Fabian Hydroelectric Plant (65).. The Main Works, Services And Supplies Provided For In This Renovation Contract Are Listed Below: - General Services Control-Command Chassis: The Replacement Of The General Services Control-Command Chassis With New Sg Unit Control-Command Cabinets, The Sectioning Of The Factory Control-Command (Transformer, Vdt, Etc.), The Replacement Of The Plc With A Schneider M340 Type Model, The Reuse Of Certain Equipment (E.G.: Existing Recorder), The Modification Of The Vdt Interface Box Located At The Factory; - Control Group Control: The Replacement Of The Group Control Chassis With New Group 1 Unit And Group 2 Unit Control Cabinets, The Reuse Of Certain Equipment (E.G.: Digital Protection Relay For Existing Groups Of The Sepam 87 Schneider Type, Rpv40 Vibration Protection Relay, Rgu), The Integration Of The Existing Rgn Remote Screens, The Integration Of The Existing Rgu Remote Screens, The Addition Of An Apsg Remote Controller Rack For Each Group Unit, The Replacement Of The Control Box Refrigeration Of Groups; - Transformers For Transition From B1 To B2: The Addition Of A 100Kva B1 B2 230Vac/400Vac Transformer, The Removal Of The 160Kva B2.B1 400Vca/230Vac Transformer, The Replacement Of The 230V/230V Tertiary Transformer With A 400Vac/400Vac Transformer; - Auxiliary Tgbts: The Replacement Of Auxiliary Distribution Cabinets (Normal, Corrugated And Continuous), The Supply And Installation Of A Socomec Diris Type Measuring Unit, The Replacement Of The Source Inverter With An Automatic Model Of The Socomec Atys Type, The Integration Of Vt And Tc Counting (Microbloc) In Future Cabinets; - Lv Electrical Cables: Replacement Of Non-Compliant Or Too Short Cables (E.G.: All Auxiliary Tgbt Cables With The Exception Of Tertiary Electrical Cables, Electrical Cables Between The Telecom Distribution Frame And The Sg Cabinet, Electrical Cables To The Continuous And Corrugated Energy Workshops, Electrical Cables To The Cabinets And Metering Boxes), Replacement Of Guard Valve And Group Instrumentation Cables, Cables Connected To The Following Recently Renovated Equipment May Be Reused: The Cabinet Sic Factory, Sic Boxes For Water Intakes, The Dspcf Box, Central Oil-Hydraulic Boxes, Rgn Cabinets, Rgu Excitation Contactor Boxes, Telecom Cabinets And Equipment (Excluding Smt), Continuous And Corrugated Energy Workshops, Metering Cabinets And Boxes, Power Outlet Boxes; - Setting Up A Living Base For The Construction Site; - Electrical Modifications To The Exterior Fittings (4 Water Outlets); The Following Equipment Will Be Reused With Possibly Minor Electrical Modifications: The Factory Sic Cabinet, The Water Intake Sic Boxes, The Dspcf Box, The Central Oil-Hydraulic Boxes, The Rgn Cabinets, The R Excitation Contactor Boxes
|