|
Tender For For The Work Of Shifting/Height Raising Of 220 Kv Pgcil-Maharajganj Dc Line (At Location No 245-246) Under Electricity Transmission Division-Ii, Mohaddipur-Gorakhpur- 1 Supply of Materials 2 24 Fibre(DWSM) OPGW Fibre Optic Cable 3 Supply of Hardware set for 24 Fibre OPGW 4 Joint Box(24 Fibre) 5 TOWER ACCESSORIES- 6 Number Plate 7 Danger Plate 8 Circuit Plate (set of two) 9 Phase Plate in sets of red, blue and yellow 10 220KV Pipe type earthing material for towers 11 Bird Guard 12 PORCELAIN DISC INSULATORS 13 160 KN 14 HARDWARE SUITABLE FOR ACSR ZEBRA 15 Single Tension fittings 16 Single Suspension fittings 17 Double Tension fittings 18 vibration Dampers 19 Mid Span compression Joint 20 Repair sleeves 21 WORK ASSOCIATED WITH CONSTRUCTION OF NEW LINE PORTION AND INTERCONNECTION WITH EXISTING LINE 22 PART-A (FOUNDATION WORKS) 23 Survey including preparation of schedule of materials, marking of locations(route length), GPS survey of linewith co-ordinates of each tower(the length of lineshall be authenticated by GPS Survey) 24 Soil Investigation Test (All kind of soil) 25 Check survey & Peg marking 26 Excavation of 220 KV Tower foundation including all earth work, back filling, leveling, watering and dewatering if necessary, preparing of crop and land compensation forms etc 27 Setting of stubs including of all foundation work but excluding the cost of concreting and excavation(Rate per location)for follwing towers 28 220 KV DA Zebra 29 220 KV DB Zebra 30 220 KV DC Zebra 31 Installation of steel reinforcement of concrete foundation including cost of steel bars, cuitting, bending & placing etc. 32 Concreting of foundaation including cost of arrangement of form boxes, shoring, shuttering & back filling, curing including the cost of cement, sand & stone ballast etc. But excluding cost of reinforcement bars. 33 1:2:4 concreting 34 PART-B (ERECTION/ STRINGING WORKS) 35 Transportation of all material from various stores under ETD-II Gorakhpur to site as required. 36 Erection of 220 KV towers including proper tightening, fixing/punching of number plates, phase plate & danger plates, bird guard, preparing of crop compensation forms etc. 37 Tack welding of all the bolts uo to height of one section of the tower or 5 meter from ground level whichever is higher with three tacks at 1200 seperation of minimum 10 mm thickness with 10mm/12mm electrodes& application of Zinc rich Aluminium paint on the affected surface including cost of all material including tack welding of River Crossing tower&Anchor tower 38 Grounding work including earth work etc for pipe type grounding including cost of coke & salt. 39 Laying, stringing, tensioning clamping, jointing etc of ACSR Zebra conductor including hoisting of insulators , fitting of all necessary hardware and accessories i.e. fittings Armour rods, vibration dampers etc.on all Six phases of 220 KV DC lines, preparing of crop compensation forms etc. 40 Laying, stringing, tensioning clamping, jointing,including fitting of all necessary Hardware and accessories of OPGW&OFAC,terminationat S/S,end to end connectivity&testing etc of 220 KV lines 41 PART-C (DISMANTLING WORKS) 42 Dismantling of 03 (Three) phases existing ACSR Zebra conductor all hardware fiting and conductor accessories e.g. Armour rod, vibration dampers, insulator strings etc of existing line and re-rolling of dismantled conductor are empty drum on re-use safety transportation of all removed material to UPPTCL store. (Quantity has been taken double for 06 phase) 43 De-stringing of 24 Fibre OPGW cable along with hardware fitting,joint box and its proper rolling 44 Dismantling and Stacking of 220 KV Double Circuit towers after cutting of bolt with all safety and precaution along with associated works. Dismantling of the tower is done piece by piece in a safe manner by removing the tack welding / punching, un-fastening the bolts &nuts in a systematic manner, the members so dismantled shall have to be in such a condition that the same can be re-used in future. To the maximum possible extent as cutting / cutting shall have to be avoided. Similarly, while de-stringing the materials are to be removed carefully without damage to the materials (Conductor/ Insulators / Hardware fittings etc.). The removed/released materials are to be re-used to the extent possible. 45 Dismantling of earlier foundation which includes Excavation,breaking of foundation upto 2 mtr depth and removing of concrete,cutting,removing of stubes and steel reinforcement,backfilling,levelling and making field suitaable for agriculture. 46 Transportation/Carriage of dismantled material (tower parts) from site to store at 220 KV S/S Mahrajganj along with loading, unloading, stacking 47 Construction of temporary site store, round the clock Watch & Ward of Dismantled tower, supplied materials at site store. Please Enable Macros to View BoQ information
|