|
1. The Subject Of The Order Is The Performance Of Construction Works On The Investment Task Entitled: Improvement Of The Energy Efficiency Of Eight Public Infrastructure Buildings Located In Wałbrzych And Subject To Conservation Supervision, Through Their Thermal Modernization, In The Scope Of The Town Hall Building Located At Plac Magistracki 1. The Task Referred To In Point 1 Is Co-Financed By The European Union Under The European Funds For Lower Silesia 2021-2027 Program: Priority Axis 9 European Funds For The Transformation Of Mining Areas In Lower Silesia, Measure 9.6 Environmental Transformation - Zit, Project No. Feds.09.06- Iz.00-0002/24 Entitled Improvement Of The Energy Efficiency Of Eight Public Infrastructure Buildings Located In Wałbrzych And Subject To Conservation Supervision, Through Their Thermal Modernization. Investment Location: The Town Hall Building Is Located At Plac Magistracki 1 In Wałbrzych (Plot No. 340, Śródmieście Precinct No. 27). The Facility Was Entered Into The Register Of Monuments On July 25, 1977 Under Registration Number 695/658/Wł. The Subject Of The Order Is The Performance Of The Following Works In Particular: 1) Insulation Of The Ceiling Above The Basement, 2) Liquidation Of Basement Wells, 3) Construction Of A Granite Pavement In Place Of The Existing Wells (In Accordance With The Guidelines Of The Lower Silesian Voivodeship Conservator Of Monuments), 4) Renovation And Reconstruction Of Toilets, Adapting Some Of Them To The Needs Of Disabled People, 5) Replacement Of Internal Doors (In Accordance With The Guidelines Of The Lower Silesian Provincial Conservator Of Monuments), 6) Separation Of A Bathroom And A Vestibule In One Of The Rooms, 7) Construction Of Power Lines With Installation Of Switchboards, 8) Construction Of A Monoblock Heat Pump Air-Water,9) Installation Of Condensate Drainage From Heat Pumps,10) Installation Of Fencing For External Heat Pump Units,11) Renovation Of The Boiler Room,12) Replacement Of Electric Water Heaters,13) Reconstruction Of The Internal Sanitary Installation, 14) Replacement Of Radiators In Hygienic And Sanitary Rooms,15) Installation Of Basic And Emergency Lighting In The Rooms Hygienic And Sanitary,16) Replacement Of The Existing Gas Boiler,17) Performance Of Necessary Accompanying And Reconstruction Works After Thermal Modernization And Installation Works,18) Performance Of Energy Performance, Which Must Be Performed In Accordance With The Regulation Of The Minister Of Infrastructure Of February 27, 2015 On The Methodology For Determining The Energy Performance Of A Building Or Part Of A Building And Energy Performance Certificates (Journal Of Laws Laws Of 2015, Item 376, As Amended), 19) Preparation Of An Ornithological And Chiropterological Opinion, 20) Execution Of An Ex-Post Audit, 21) Execution Of Other Works Described In The Design Documentation. The Detailed Scope Of The Subject Of The Order Is Described In: 1) Agreement, 2) Specification Of The Terms Of Order
|