1. The Subject Of The Order Is The Comprehensive Implementation In The Form Of Design And Build Of The Task Entitled: Construction Of A Sanitary Sewage Network In Wola Łaskarzewska, For Which The Łaskarzew Commune Received Financial Assistance Under The Agreement To Provide The Project With Non-Returnable Support From The Development Plan, Related To The Implementation Of The Project As Part Of Investment B3.1.1 Investments In Sustainable Water And Sewage Management In Rural Areas. A Detailed Description Of The Subject Of The Order, A Description Of The Employers Requirements In Terms Of Design, Implementation And Acceptance Are Specified In: The Functional And Utility Program, Hereinafter Referred To As Ffu, Together With The Annexes And The Draft Provisions Of The Contract - Annex No. 4 To The Swz. The Scope Of The Project Will Include The Construction Of A Sewage Network. On The Following Plots: Wola Łaskarzewska District: 75/17, 75/26, 75/15, 75/18, 75/28, 76/3, 894, 77, 78, 79, 82, 83/2, 83/1, 84/2, 85, 86/4, 86/5, 87, 88/2, 89, 90, 91, 92, 93/1, 94, 95, 96, 97/1, 97/3, 97/2, 98, 99/1, 102/2, 103, 104, 105, 106/2, 106/1, 107, 108, 109/2, 109/1, 110, 112, 115/3, 114, 117/2, 117/4, 117/6, 118, 891/1, 122, 121,123, 125, 126, 129, 130, 131/2, 131/1, 132/2, 134/1, 134/4, 135, 136, 137, 138, 139, 140, 142, 143/1, 145/1, 145/3, 146, 147, 148, 149, 150, 151, 152/1, 153, 154/1, 156/1, 157/1, 158/8, 159/1, 159/4, 159/3, 161, 162, 163, 169/1, 170/1, 170/2, 171/3, 171/4, 171/2, 172/1, 172/2, 173/3, 173/4, 175/1, 179, 180, 202, 203/1, 203/4, 204/1, 206, 207, 208, 209, 210, 211, 212, 213/1, 213/2, 215, 216, 219, 220, 221/1, 221/2, 222, 223, 224/1,225, 229, 233, 234/1, 245/1, 245/2, 246, 383/5, 383/2, 383/4, 383/3, 384/1, 386/1, 386/4, 387, 389/2, 390/1, 390/2, 391, 392/2, 393, 395/1, 395/2, 396/1, 396/2, 400, 164/1, 392/1, 384/2, 159/5. The Investment Will Include The Construction Of A Pressure Sanitary Sewage Network With A Total Length Of Approx. 7.79 Km (Main Sewer Approx. 4.287 Km And Side Pipes Approx. 3.505 Km In Accordance With The Pfu) Along With 100 Domestic Sewage Pumping Stations. In Addition, It Is Planned To Implement A System For Monitoring And Controlling The Operation Of The Sewage Network - Thanks To The Use Of Sensors At Key Points In The Network, It Will Be Possible To Continuously Monitor Parameters Such As Sewage Flow, Pressure In The Pipelines And The Filling Level Of The Pumping Station; Intelligent Sewage Pumping Stations (100 Pieces) Are Also Planned As Elements Of This Ict System. The Scope Of The Subject Of The Order Includes: Stage I - Design Works• Development Of Comprehensive Design Documentation For The Investment, • Obtaining All Opinions, Arrangements And Decisions Necessary For The Implementation Of The Order (The Investor Has A Decision To Determine The Location Of The Public Purpose Investment), • Obtaining A Building Permit/Notifying Construction Works, • Preparing Cost Estimates To The Extent Necessary For The Correct
|