|
Investment Task Titled: Adaptation To Climate Change Through The Development Of Green And Blue Infrastructure In The City Of Stalowa Wola In The Scope Of The Investment Titled Sealing Of Impervious Surfaces In The Area Adjacent To The Block Of Flats At Ul. Hutnicza 13 In Stalowa Wola Using Green And Blue Infrastructure;3. The Investment Task, Including The Construction Of The Facility In Question, Will Consist Of The Following Construction Works: - Part 1 Of The Order - Hutnicza 13 (Area Adjacent To The Block): A) Preparation Of A Complete Set Of Design Documentation, Including: Construction, Technical And Executive Design Along With The Necessary Arrangements, Administrative Decisions And Industry Designs (Road, Electrical, Greenery). B) Demolition Of Existing Surfaces: Concrete Cubes, Concrete Slabs (Trelinka) And Elements Curbs And Edges Colliding With The Planned Development.C) Earthworks And Preparatory Works, Including Land Profiling, Replacements And Additions To The Soil, And Preparation Of The Ground For The Designed Permeable Surfaces.D) Construction Of Hardened Surfaces With Increased Permeability, Including Hydro-Grouting Cubes, Openwork Slabs And Other Retention Solutions Provided For In The Concept.E) Shaping And Increasing The Surface Biologically Active Areas, Including Construction Of Green Areas, Retention Beds And Planting Of Hydrophytic Plants.F) Construction And Reconstruction Of Area Lighting, Including Cable Installation, Poles And Led Fixtures.G) Installation Of Small Architecture Elements, In Particular: Benches, Waste Bins.H) Carrying Out Agrotechnical Works, Restoring Lawns, Spreading Topsoil, Leveling And Tidying Up The Area.I) Preparation Of As-Built Documentation, Including Surveying Inventory And Performing Authors Supervision4. The Detailed Scope Of The Order For Parts 1-3 Of The Order Is Specified In The Functional And Utility Program And The Contract Template, Which Constitute Appendices To Swz.5. The Task Is Co-Financed Under The Program: European Funds For Eastern Poland 2021-2027 Call: Fepw.02.02-Iw.01-002/23 Adaptation To Climate Change, Priority Fepw.02 Energy And Climate Measure: Fepw.02.02 Adaptation To Climate Change, 5. Project Type: I.6. Moreover, When Carrying Out Construction Works, The Contractor Should Take Into Account The Guidelines For The Dnsh Contractor Constituting An Annex To Swz.7. Contractor Pursuant To Art. 95 Section 1 Of The Public Procurement Law, The Contractor Or Subcontractor Will Be Obliged To: Employ Persons Under An Employment Contract To Perform Activities Related To The Execution Of The Order, The Performance Of Which Consists In Performing Work In The Manner Specified In Art. 22 Of The Act Of 26 June 1974 - Labor Code (Consolidated Text: Journal Of Laws Of 2022, Items 1510, 1700, 2140, Of 2023, Item 240) The Following Activities: - Earthworks - Works Related To The Construction Of Surfaces - General Construction Works1) The Ordering Party Requires That Persons Performing The Ac
|