|
1) The Subject Of The Order Is The Development Of Design Documentation (Concept, Construction Design And Detailed Design) For The Construction Of A Dry Reservoir On The Jakubówka River, Commune. Działoszyce, Along With Obtaining All Legally Required Consents And Arrangements Required By Law To Carry Out The Task In Question. The Investment Is Initially Planned Within Plots No. 485,484,504/1,503/1,478/1, 477/1 In Januszowice, Commune. Działoszyce District 0013 (Illustrative Location, Annex No. 5). W Szczególności Projekty Powinny Zawierać Rozwiązania Dotyczące: Korpusu Zapory, Budowli Zrzutowej, Regulacji Rzeki W Zakresie Oddziaływania Zbiornika, Systemu Automatycznego Sterowania Zamknięć Oraz Monitoringu Cctv I Sswin, Powierzchnia Zbiornika Ok. 2.8Hektara. The Role Of The Reservoir Will Be To Automatically Capture And Periodically Retain Flood Waters In Its Bowl, While Enabling Continuous, Safe Outflow Of Water Through A Bottom Outlet In An Amount That Does Not Cause Damage To The Areas Located Below The Facility. Due To The Need To Purchase Plots Necessary To Implement The Investment, The Order Should Be Prepared In Two Stages. Stage 1) Preparation Of The Concept:1. Preparation Of The Program And Spatial Concept Of The Reservoir In At Least Two Implementation Variants, Including Indication Of Min. Two Alternative Locations. 1.1. The Concept Should Include At Least: - Description And Drawings Of The Proposed Technical Solutions, - Indication Of The Basic Parameters Of The Designed Reservoir (Determination Of The Reservoir Class, Combined Analysis Of Flood Waves) - Description Of Water Management And Water Distribution In The Reservoir, - List Of Plots Intended For Occupation, 1.2. Estimation Of Implementation Costs For Each Variant, 1.3. Inventory Of Trees And Shrubs. Stage 2) Implementation After Obtaining Investment Plots By Ordering Party. 2.1.1 Carrying Out Geodetic And Measurement Works. 2.1.2 Preparation Of The Necessary Geological And Engineering Documentation. 2.1.3 Preparation Of Hydrological Documentation, Including, Among Others: Hydrological And Hydraulic Calculations, Calculations Of Probable Flows Along With The Determination Of Flood Wave Diagrams, Determination Of Characteristic Flows, Taking Into Account The Untouchable Biological Flow. 2.1.4 Preparation Of A Report On The Impact Of The Project On The Environment, If Required, 2.1.5 Obtaining Land Cadastral Maps With Extracts From The Register, 2.2 Design Works 2.2.1 Construction And Detailed Design 2.2.2 Design Of Real Estate Division 2.2.3 Water Law Report. 2.2.4 Detailed Design Consisting Of, Among Others: • Design Of Shifting The River Bed For The Duration Of The Construction Of Discharge Devices, • Design Of Drainage And Protection Of The Foundation Pit, • Design Of Technological Roads Related To The Construction (Communication With The Soil Deposit For The Construction Of The Dam Body), • Design Of Forming The Reservoir Bowl, • Design Of Discharge Devices, • Design Of An Ea
|