Landscape Architectural Services – Partial Landscaping Of Karolinas Outpost 2026-27. Technical Operational Plan For Mine Closure And Landscaping Of The Karolina Coal Mine On The Pécs-Mecsekszabolcs-Kőszén Mine Plot Ii. As Planned As Part Of The Implementation Of Its Schedule • In The K-I Section, A Designated Approx. Extermination Of Woody Vegetation In The Area Of 1 Ha, Delivery Of Extracted Woody Vegetation With A One-Way Transport Distance Of 1000 M, The So-Called Coal Receiving Level To The Place Designated For It, And Depositing It Locally, Separately. Woody Vegetation Must Be Harvested At A Height Of No More Than 0.1 M Above The Ground Surface, In Order To Leave The Smallest Possible Stump Size. The Root System Of The Extracted Woody Vegetation Must Be Removed In Parallel With The Earthwork, And Together With The Excavated Barren Material, It Must Be Brought Down To The Mine Pit And Placed There. • Soil Recovery (Picking Up A Layer Of Soil Thicker Than 0.2 M From Previous Spreading), Transporting The Saved Soil Within 200 Meters And Min. Spreading It In A Thickness Of 0.4 M; • Soil Salvage (Picking Up From Previously Deposited Material), Transporting The Salvaged Soil Within 500 Meters And Min. Spreading It In A Thickness Of 0.4 M; • Barren Dredging Within The Work Area And One-Way Transport Of The Excavated Barren Within 500 Meters Within The Landscaping Area, And Loading And Leveling Of The Dozer There; • In Case Of Filling Material Required For The Planned Final Morphology, One-Way Transport Of The Barren Excavated In The N. Barren Ravine Within 2,500 Meters To The Working Pile In The E Section And Loading And Leveling There By Dozer. • In The Areas Of The N Barren Wasteland Defined By The Ph, The Soil (Clay Wasteland) With A Layer Thickness Of More Than 20 Cm, Which Was Previously Placed On The Barren Land For Landscaping Purposes, Must Be Saved. The Works Should Be Organized In Such A Way That The Salvaged Soil Can Be Transported Immediately After The Salvage In Other Parts Of The Work Area To The Area Prepared For Final Soil Spreading, Where It Must Be Spread With A Thickness Of 0.4 M. If The Salvaged Soil Cannot Be Spread Directly On The Final Copper Mine, It May Be Necessary To Transport And Deposit The Salvaged Soil Within 1,500 Meters, Which Is Decided By The Responsible Technical Manager Of The Mine Operation. • Continuation Of Barren Dredging, Loading, And Delivery To The Mine Pit From The Acceptance Status Of The Work Area On The N. Barren Pit, Approx. 2,500 M One-Way Delivery Distance. The Inert Material Delivered To The Mine Pit Must Be Filled With Dozer Work. On The N Barren Ravine, Barren Dredging Must Be Continued In Such A Way That, Measured In The Direction Of Slope, In The End Section To Be Landscaped, Approx. Every 5 Meters Min. A 10 M Wide Horizontal Bench Must Be Created. Max. Must Be Applied To This Bench. Within A 500 M Transport Distance, The Saved Soil In Other Parts Of The Work Area, And From There In 5 M Strips, Must Be Spread On The Copper With A Thickness Of 0.4 M. After Carrying Out The Strip Soil Spreading, The Final Design Of The Landscaping - Excluding The 10 M Wide Bench - Was Given In The Müt
Contact Information
Contact No.
+36 12010611
Email
lovasz.gyorgy@bvh.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 106900400
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.